Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Village of Lebanon
Lebanon, KY · 64 certified beds · Last Life Safety survey August 15, 2025
CMS Certification Number 185437 · first certified October 1997
Ownership
Independently operated (no chain recorded by CMS) · For profit - Partnership
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within KY
4 citations — more than 19% of the 267 certified nursing homes in KY. Compared within KY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
When is the next survey likely?
The window opens October 2026. This facility’s last Life Safety survey was August 2025. Facilities in KY are typically surveyed 14–59 months after the last one (median 28), measured over 391 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Village of Lebanon
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 4 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in KY, and nationally. Surveyors differ markedly between states, so the KY figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 4 |
| Median facility in KY | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| February 21, 2019 | 0 |
| April 21, 2022 | 0 |
| August 15, 2025 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | 1 | 2025-08-15 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2025-08-15 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2025-08-15 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2025-08-15 |
What the citations cover
- Smoke Deficiencies 2
- Egress Deficiencies 1
- Gas, Vacuum, and Electrical Systems Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 2 |
| Egress Deficiencies | 1 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 15, 2025 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (September 4, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (September 17, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 4, 2025) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (September 10, 2025) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.