Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Heartland Villa Nursing And Rehabilitation Center
Lewisport, KY · 45 certified beds · Last Life Safety survey January 15, 2026
CMS Certification Number 185399 · first certified December 1994
Ownership
Operated by ENCORE HEALTH PARTNERS · For profit - Limited Liability company
- Ownership changed February 1, 2024 (change of ownership)to HEARTLAND VILLA NURSING & REHABILITATION CENTER from HBR LEWISPORT, LLC
Position within KY
6 citations — more than 33% of the 266 certified nursing homes in KY. Compared within KY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 0 citations; the earlier surveys on file averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens February 2027 — about 3 months from now. This facility’s last Life Safety survey was January 2026. Facilities in KY are typically surveyed 13–49 months after the last one (median 16), measured over 414 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about Heartland Villa Nursing And Rehabilitation Center
One email when it happens. No account; stop it any time with one click.
How that compares
Compared with the median facility in KY, and nationally. Surveyors differ markedly between states, so the KY figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 6 |
| Median facility in KY | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 27, 2019 | 1 |
| September 6, 2024 | 5 |
| January 15, 2026 | 0 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2024-09-06 |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 1 | 2024-09-06 |
| K-0361 | Ensure that waiting areas, nurse’s stations, gift shops, and cooking facilities, open to the corridor are properly protected. | 1 | 2024-09-06 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2024-09-06 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2024-09-06 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Smoke Deficiencies 2
- Miscellaneous Deficiencies 1
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Smoke Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
September 6, 2024 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (October 4, 2024) |
| K-0361 | Ensure that waiting areas, nurse’s stations, gift shops, and cooking facilities, open to the corridor are properly protected. | Deficient, Provider has date of correction (October 4, 2024) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (October 4, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (October 4, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (October 4, 2024) |
November 27, 2019 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (December 26, 2019) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.