Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Wesley Manor

Louisville, KY · 68 certified beds · Last Life Safety survey July 25, 2025

CMS Certification Number 185136 · first certified April 1976

Ownership

Independently operated (no chain recorded by CMS) · Non profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

16
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
3
Inspection & testing records
Of the citations on file

Position within KY

16 citations — more than 82% of the 267 certified nursing homes in KY. Compared within KY rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Holding steadyabout the same at the latest survey as at its earlier surveys in the window.

The latest survey found 5 citations; the earlier surveys in the window averaged 5.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: September 2026 to June 2030. This facility’s last Life Safety survey was July 2025. Facilities in KY are typically surveyed 14–59 months after the last one (median 28), measured over 391 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Wesley Manor

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

4 of the 16 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 16 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in KY, and nationally. Surveyors differ markedly between states, so the KY figure is the meaningful one.

This facility16KY median7National median11
Citations on file over three years, compared
MeasureCitations
This facility16
Median facility in KY7
Median facility nationally11

Survey history

Citations at each Life Safety survey
72019-0642022-0252025-07
Citations at each Life Safety survey
Survey dateCitations
June 28, 20197
February 25, 20224
July 25, 20255

Most-cited tags

Most-cited tags at this facility
E-00042E-00391K-03211K-09191K-03251K-03631K-02111K-07121
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
E-0004Develop and maintain an Emergency Preparedness Program (EP).22022-02-25
E-0039Conduct testing and exercise requirements.12022-02-25
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12022-02-25
K-0919Meet requirements for the use of electrical equipment.12019-06-28
K-0325Have properly installed hallway dispensers for alcohol-based hand rub.12025-07-25
K-0363Install corridor and hallway doors that block smoke.12019-06-28
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.12022-02-25
K-0712Have simulated fire drills held at unexpected times.12019-06-28

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 7
  • Emergency Preparedness Deficiencies 4
  • Gas, Vacuum, and Electrical Systems Deficiencies 2
  • Egress Deficiencies 2
  • Other 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies7
Emergency Preparedness Deficiencies4
Gas, Vacuum, and Electrical Systems Deficiencies2
Egress Deficiencies2
Miscellaneous Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

July 25, 2025 — 5 citations

Citations issued on July 25, 2025
TagWhat the surveyor checksStatus
E-0026Establish roles under a Waiver declared by secretary.Deficient, Provider has date of correction (September 12, 2025)
K-0325Have properly installed hallway dispensers for alcohol-based hand rub.Deficient, Provider has date of correction (September 12, 2025)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (September 12, 2025)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (September 12, 2025)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (September 12, 2025)

February 25, 2022 — 4 citations

Citations issued on February 25, 2022
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (June 3, 2022)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (June 3, 2022)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (April 1, 2022)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (April 1, 2022)

June 28, 2019 — 7 citations

Citations issued on June 28, 2019
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (August 1, 2019)
K-0232Have corridors or aisles that are unobstructed and are at least 8 feet in width.Deficient, Provider has date of correction (August 1, 2019)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (August 1, 2019)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (August 1, 2019)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (September 2, 2019)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (August 1, 2019)
K-0919Meet requirements for the use of electrical equipment.Deficient, Provider has date of correction (August 1, 2019)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.