Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Katzman Family Center for Living
CHELSEA, MA · 123 certified beds · Last Life Safety survey March 11, 2026
CMS Certification Number 225451 · first certified July 1990
Ownership
Operated by CHELSEA JEWISH LIFECARE · Non profit - Other
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MA
14 citations — more than 63% of the 341 certified nursing homes in MA. Compared within MA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 5 citations; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens March 2027 — about 5 months from now. This facility’s last Life Safety survey was March 2026. Facilities in MA are typically surveyed 12–15 months after the last one (median 13), measured over 556 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Katzman Family Center for Living
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
How that compares
Compared with the median facility in MA, and nationally. Surveyors differ markedly between states, so the MA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 14 |
| Median facility in MA | 11 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| May 9, 2024 | 0 |
| April 30, 2025 | 9 |
| March 11, 2026 | 5 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2026-03-11 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2026-03-11 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2026-03-11 |
| K-0311 | Have an enclosure around a vertical opening shaft. | 2 | 2026-03-11 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2025-04-30 |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 1 | 2025-04-30 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2025-04-30 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2025-04-30 |
What the citations cover
- Smoke Deficiencies 8
- Miscellaneous Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Egress Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 8 |
| Miscellaneous Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Egress Deficiencies | 1 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 11, 2026 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (April 15, 2026) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (April 30, 2026) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (May 1, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 1, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (March 31, 2026) |
April 30, 2025 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (July 3, 2025) |
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (July 3, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (July 3, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (July 3, 2025) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (July 3, 2025) |
| K-0531 | Have elevators that firefighters can control in the event of a fire. | Deficient, Provider has date of correction (July 3, 2025) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (July 3, 2025) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (July 3, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (July 3, 2025) |