Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

CRANEVILLE REHABILITATION AND SKILLED CARE CENTER

DALTON, MA · 89 certified beds · Last Life Safety survey April 1, 2025

CMS Certification Number 225455 · first certified July 1990

Ownership

Operated by BANECARE MANAGEMENT · For profit - Individual

No change of ownership on CMS record since January 1, 2016, when the records begin.

8
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
2
Tags cited more than once
Across separate surveys
3
Inspection & testing records
Of the citations on file

Position within MA

8 citations — more than 36% of the 341 certified nursing homes in MA. Compared within MA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 1 citation; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Well past the typical window (March 2026 to June 2026), and past the point by which nine in ten MA facilities have been surveyed. This facility’s last Life Safety survey was April 2025. Facilities in MA are typically surveyed 12–15 months after the last one (median 13), measured over 556 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about CRANEVILLE REHABILITATION AND SKILLED CARE CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

2 of the 8 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 8 Life Safety citations above. The Physical Environment Index

  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0880 Provide and implement an infection prevention and control program.
  • F-0908 Keep all essential equipment working safely.

How that compares

Citations on file over three years

Compared with the median facility in MA, and nationally. Surveyors differ markedly between states, so the MA figure is the meaningful one.

This facility8MA median11National median11
Citations on file over three years, compared
MeasureCitations
This facility8
Median facility in MA11
Median facility nationally11

Survey history

Citations at each Life Safety survey
42022-0732024-0112025-04
Citations at each Life Safety survey
Survey dateCitations
July 19, 20224
January 18, 20243
April 1, 20251

Most-cited tags

Most-cited tags at this facility
K-02523K-03532E-00371E-00411K-09181
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0252Provide at least two remote exits on each floor or fire section of the building.32025-04-01
K-0353Inspect, test, and maintain automatic sprinkler systems.22024-01-18
E-0037Establish staff and initial training requirements.12024-01-18
E-0041Implement emergency and standby power systems.12022-07-19
K-0918Have generator or other power source capable of supplying service within 10 seconds.12022-07-19

What the citations cover

Citations by CMS category
  • Egress Deficiencies 3
  • Emergency Preparedness Deficiencies 2
  • Smoke Deficiencies 2
  • Gas, Vacuum, and Electrical Systems Deficiencies 1
Citations by CMS category
CategoryCitations
Egress Deficiencies3
Emergency Preparedness Deficiencies2
Smoke Deficiencies2
Gas, Vacuum, and Electrical Systems Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

April 1, 2025 — 1 citation

Citations issued on April 1, 2025
TagWhat the surveyor checksStatus
K-0252Provide at least two remote exits on each floor or fire section of the building.Deficient, Provider has date of correction (April 4, 2025)

January 18, 2024 — 3 citations

Citations issued on January 18, 2024
TagWhat the surveyor checksStatus
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (February 21, 2024)
K-0252Provide at least two remote exits on each floor or fire section of the building.Deficient, Provider has date of correction (February 9, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (February 21, 2024)

July 19, 2022 — 4 citations

Citations issued on July 19, 2022
TagWhat the surveyor checksStatus
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (August 5, 2022)
K-0252Provide at least two remote exits on each floor or fire section of the building.Deficient, Provider has date of correction (August 15, 2022)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (August 5, 2022)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (August 5, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.