Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

DEXTER HOUSE HEALTHCARE

MALDEN, MA · 130 certified beds · Last Life Safety survey September 26, 2025

CMS Certification Number 225137 · first certified August 1967

Ownership

Operated by NEXT STEP HEALTHCARE · For profit - Limited Liability company

  • Ownership changed September 1, 2017 (change of ownership)from GGNSC MALDEN DEXTER LLC
17
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
4
Tags cited more than once
Across separate surveys
9
Inspection & testing records
Of the citations on file

Position within MA

17 citations — more than 71% of the 341 certified nursing homes in MA. Compared within MA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 7 citations; the earlier surveys in the window averaged 5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: September 2026 to December 2026. This facility’s last Life Safety survey was September 2025. Facilities in MA are typically surveyed 12–15 months after the last one (median 13), measured over 556 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about DEXTER HOUSE HEALTHCARE

One email when it happens. No account; stop it any time with one click.

Which alerts

3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 17 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0909 Regularly inspect all bed frames, mattresses, and bed rails (if any) for safety; and all bed rails and mattresses must attach safely to the bed frame.
  • F-0908 Keep all essential equipment working safely.

How that compares

Citations on file over three years

Compared with the median facility in MA, and nationally. Surveyors differ markedly between states, so the MA figure is the meaningful one.

This facility17MA median11National median11
Citations on file over three years, compared
MeasureCitations
This facility17
Median facility in MA11
Median facility nationally11

Survey history

Citations at each Life Safety survey
02023-09102024-1072025-09
Citations at each Life Safety survey
Survey dateCitations
September 28, 20230
October 2, 202410
September 26, 20257

Most-cited tags

Most-cited tags at this facility
K-03242K-02112K-07122K-03452K-07111K-03551K-09201K-03721
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0324Provide properly protected cooking facilities.22025-09-26
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.22025-09-26
K-0712Have simulated fire drills held at unexpected times.22025-09-26
K-0345Have approved installation, maintenance and testing program for fire alarm systems.22025-09-26
K-0711Provide a written emergency evacuation plan.12024-10-02
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.12024-10-02
K-0920Ensure proper usage of power strips and extension cords.12024-10-02
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12024-10-02

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 7
  • Egress Deficiencies 4
  • Gas, Vacuum, and Electrical Systems Deficiencies 3
  • Miscellaneous Deficiencies 3
Citations by CMS category
CategoryCitations
Smoke Deficiencies7
Egress Deficiencies4
Gas, Vacuum, and Electrical Systems Deficiencies3
Miscellaneous Deficiencies3

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

September 26, 2025 — 7 citations

Citations issued on September 26, 2025
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (December 15, 2025)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (December 15, 2025)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (December 15, 2025)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (December 15, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (December 15, 2025)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (December 15, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (December 15, 2025)

October 2, 2024 — 10 citations

Citations issued on October 2, 2024
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (November 15, 2024)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (November 15, 2024)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (November 15, 2024)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (November 15, 2024)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (November 15, 2024)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (November 15, 2024)
K-0711Provide a written emergency evacuation plan.Deficient, Provider has date of correction (November 15, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (November 15, 2024)
K-0911Meet requirements for the installation and maintenance of electrical systems.Deficient, Provider has date of correction (November 15, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (November 15, 2024)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.