Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

CEDAR VIEW REHABILITATION AND HEALTHCARE CENTER

METHUEN, MA · 106 certified beds · Last Life Safety survey January 14, 2026

CMS Certification Number 225333 · first certified July 1989

Ownership

Operated by MARQUIS HEALTH SERVICES · For profit - Limited Liability company

No change of ownership on CMS record since January 1, 2016, when the records begin.

9
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
5
Inspection & testing records
Of the citations on file

Position within MA

9 citations — more than 39% of the 341 certified nursing homes in MA. Compared within MA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 5 citations; the earlier surveys in the window averaged 2. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens January 2027 — about 3 months from now. This facility’s last Life Safety survey was January 2026. Facilities in MA are typically surveyed 12–15 months after the last one (median 13), measured over 556 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about CEDAR VIEW REHABILITATION AND HEALTHCARE CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

1 of the 9 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

How that compares

Citations on file over three years

Compared with the median facility in MA, and nationally. Surveyors differ markedly between states, so the MA figure is the meaningful one.

This facility9MA median11National median11
Citations on file over three years, compared
MeasureCitations
This facility9
Median facility in MA11
Median facility nationally11

Survey history

Citations at each Life Safety survey
02024-0242025-0152026-01
Citations at each Life Safety survey
Survey dateCitations
February 21, 20240
January 24, 20254
January 14, 20265

Most-cited tags

Most-cited tags at this facility
K-03722K-03241K-02111K-03451K-09181K-03211E-00391K-02931
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.22026-01-14
K-0324Provide properly protected cooking facilities.12026-01-14
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.12026-01-14
K-0345Have approved installation, maintenance and testing program for fire alarm systems.12025-01-24
K-0918Have generator or other power source capable of supplying service within 10 seconds.12026-01-14
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12025-01-24
E-0039Conduct testing and exercise requirements.12026-01-14
K-0293Have properly located and lighted "Exit" signs.12025-01-24

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 5
  • Egress Deficiencies 2
  • Gas, Vacuum, and Electrical Systems Deficiencies 1
  • Emergency Preparedness Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies5
Egress Deficiencies2
Gas, Vacuum, and Electrical Systems Deficiencies1
Emergency Preparedness Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

January 14, 2026 — 5 citations

Citations issued on January 14, 2026
TagWhat the surveyor checksStatus
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (January 30, 2026)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (February 6, 2026)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (January 26, 2026)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (January 26, 2026)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (January 26, 2026)

January 24, 2025 — 4 citations

Citations issued on January 24, 2025
TagWhat the surveyor checksStatus
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (March 4, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (March 4, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (March 4, 2025)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (March 4, 2025)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.