Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

PILGRIM REHABILITATION & SKILLED NURSING CENTER

PEABODY, MA · 152 certified beds · Last Life Safety survey January 29, 2026

CMS Certification Number 225048 · first certified January 1967

Ownership

Operated by INTEGRITUS HEALTHCARE · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

15
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
4
Tags cited more than once
Across separate surveys
11
Inspection & testing records
Of the citations on file

Position within MA

15 citations — more than 67% of the 341 certified nursing homes in MA. Compared within MA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 5 citations; the earlier surveys in the window averaged 5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens January 2027 — about 4 months from now. This facility’s last Life Safety survey was January 2026. Facilities in MA are typically surveyed 12–15 months after the last one (median 13), measured over 556 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about PILGRIM REHABILITATION & SKILLED NURSING CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

4 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 15 Life Safety citations above. The Physical Environment Index

  • F-0909 Regularly inspect all bed frames, mattresses, and bed rails (if any) for safety; and all bed rails and mattresses must attach safely to the bed frame.

How that compares

Citations on file over three years

Compared with the median facility in MA, and nationally. Surveyors differ markedly between states, so the MA figure is the meaningful one.

This facility15MA median11National median11
Citations on file over three years, compared
MeasureCitations
This facility15
Median facility in MA11
Median facility nationally11

Survey history

Citations at each Life Safety survey
02024-02102025-0152026-01
Citations at each Life Safety survey
Survey dateCitations
February 29, 20240
January 30, 202510
January 29, 20265

Most-cited tags

Most-cited tags at this facility
K-07122K-03242K-09182K-03532K-09201K-02221K-09141K-09111
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0712Have simulated fire drills held at unexpected times.22026-01-29
K-0324Provide properly protected cooking facilities.22026-01-29
K-0918Have generator or other power source capable of supplying service within 10 seconds.22026-01-29
K-0353Inspect, test, and maintain automatic sprinkler systems.22026-01-29
K-0920Ensure proper usage of power strips and extension cords.12025-01-30
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.12025-01-30
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.12026-01-29
K-0911Meet requirements for the installation and maintenance of electrical systems.12025-01-30

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 6
  • Gas, Vacuum, and Electrical Systems Deficiencies 5
  • Miscellaneous Deficiencies 3
  • Egress Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies6
Gas, Vacuum, and Electrical Systems Deficiencies5
Miscellaneous Deficiencies3
Egress Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

January 29, 2026 — 5 citations

Citations issued on January 29, 2026
TagWhat the surveyor checksStatus
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (March 10, 2026)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (March 30, 2026)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (March 10, 2026)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (March 10, 2026)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (March 10, 2026)

January 30, 2025 — 10 citations

Citations issued on January 30, 2025
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (March 26, 2025)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (March 26, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (March 26, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (March 26, 2025)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (March 26, 2025)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (March 26, 2025)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (March 26, 2025)
K-0911Meet requirements for the installation and maintenance of electrical systems.Deficient, Provider has date of correction (March 26, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (March 26, 2025)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (March 26, 2025)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.