Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
PINNACLE HEALTH & REHAB AT N BERWICK
NORTH BERWICK, ME · 64 certified beds · Last Life Safety survey January 27, 2026
CMS Certification Number 205086 · first certified January 1993
Ownership
Independently operated (no chain recorded by CMS) · For profit - Individual
- Ownership changed August 5, 2019 (change of ownership)to PINNACLE GROUP OF HUDSON VALLEY III LLC from CH WRIGHT INC
Position within ME
25 citations — more than 79% of the 78 certified nursing homes in ME. Compared within ME rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 10.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens February 2027 — about 5 months from now. This facility’s last Life Safety survey was January 2026. Facilities in ME are typically surveyed 13–15 months after the last one (median 14), measured over 115 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about PINNACLE HEALTH & REHAB AT N BERWICK
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
7 of the 25 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 25 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in ME, and nationally. Surveyors differ markedly between states, so the ME figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 25 |
| Median facility in ME | 17 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| August 23, 2023 | 10 |
| October 30, 2024 | 11 |
| January 27, 2026 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| E-0015 | Address subsistence needs for staff and patients. | 2 | 2026-01-27 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2026-01-27 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2024-10-30 |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | 2 | 2026-01-27 |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | 1 | 2023-08-23 |
| K-0300 | Meet other general requirements that are deficient. | 1 | 2023-08-23 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2024-10-30 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2023-08-23 |
What the citations cover
- Smoke Deficiencies 7
- Emergency Preparedness Deficiencies 7
- Gas, Vacuum, and Electrical Systems Deficiencies 6
- Egress Deficiencies 3
- Other 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 7 |
| Emergency Preparedness Deficiencies | 7 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 6 |
| Egress Deficiencies | 3 |
| Miscellaneous Deficiencies | 1 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 27, 2026 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (February 13, 2026) |
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (February 20, 2026) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (February 26, 2026) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (January 27, 2026) |
October 30, 2024 — 11 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (October 30, 2024) |
| E-0009 | Include a process for Emergency Preparedness collaboration. | Deficient, Provider has date of correction (November 13, 2024) |
| E-0013 | Develop Emergency Preparedness policies and procedures. | Deficient, Provider has date of correction (October 30, 2024) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (November 8, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (November 8, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (November 13, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (December 2, 2024) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (November 15, 2024) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (November 4, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (November 4, 2024) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (October 29, 2024) |
August 23, 2023 — 10 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (October 13, 2023) |
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (October 13, 2023) |
| K-0232 | Have corridors or aisles that are unobstructed and are at least 8 feet in width. | Deficient, Provider has date of correction (October 13, 2023) |
| K-0300 | Meet other general requirements that are deficient. | Deficient, Provider has date of correction (October 13, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (October 13, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (October 13, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (October 13, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (October 13, 2023) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (October 13, 2023) |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | Deficient, Provider has date of correction (October 13, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.