Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

CEDAR RIDGE CENTER

SKOWHEGAN, ME · 75 certified beds · Last Life Safety survey April 16, 2026

CMS Certification Number 205060 · first certified August 1989

Ownership

Operated by GENESIS HEALTHCARE · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

22
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
2
Tags cited more than once
Across separate surveys
9
Inspection & testing records
Of the citations on file

Position within ME

22 citations — more than 71% of the 78 certified nursing homes in ME. Compared within ME rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 4 citations; the earlier surveys in the window averaged 9. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens May 2027 — about 7 months from now. This facility’s last Life Safety survey was April 2026. Facilities in ME are typically surveyed 13–15 months after the last one (median 14), measured over 115 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about CEDAR RIDGE CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

2 of the 22 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 22 Life Safety citations above. The Physical Environment Index

  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0880 Provide and implement an infection prevention and control program.
  • F-0908 Keep all essential equipment working safely.

How that compares

Citations on file over three years

Compared with the median facility in ME, and nationally. Surveyors differ markedly between states, so the ME figure is the meaningful one.

This facility22ME median17National median11
Citations on file over three years, compared
MeasureCitations
This facility22
Median facility in ME17
Median facility nationally11

Survey history

Citations at each Life Safety survey
72022-06112025-0142026-04
Citations at each Life Safety survey
Survey dateCitations
June 15, 20227
January 30, 202511
April 16, 20264

Most-cited tags

Most-cited tags at this facility
K-09112K-02112K-03211K-07531K-07121K-03721K-03311K-03551
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0911Meet requirements for the installation and maintenance of electrical systems.22026-04-16
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.22025-01-30
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12022-06-15
K-0753Have restrictions on the use of highly flammable decorations.12022-06-15
K-0712Have simulated fire drills held at unexpected times.12022-06-15
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12026-04-16
K-0331Construct fire resistant interior walls.12022-06-15
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.12025-01-30

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 9
  • Gas, Vacuum, and Electrical Systems Deficiencies 5
  • Emergency Preparedness Deficiencies 2
  • Miscellaneous Deficiencies 2
  • Other 4
Citations by CMS category
CategoryCitations
Smoke Deficiencies9
Gas, Vacuum, and Electrical Systems Deficiencies5
Emergency Preparedness Deficiencies2
Miscellaneous Deficiencies2
Egress Deficiencies2
Construction Deficiencies1
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

April 16, 2026 — 4 citations

Citations issued on April 16, 2026
TagWhat the surveyor checksStatus
K-0133Install a two-hour-resistant firewall separation.Deficient, Provider has date of correction (May 4, 2026)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (April 28, 2026)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (May 4, 2026)
K-0911Meet requirements for the installation and maintenance of electrical systems.Deficient, Provider has date of correction (May 4, 2026)

January 30, 2025 — 11 citations

Citations issued on January 30, 2025
TagWhat the surveyor checksStatus
E-0015Address subsistence needs for staff and patients.Deficient, Provider has date of correction (February 14, 2025)
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (February 26, 2025)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (February 24, 2025)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (February 3, 2025)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (February 5, 2025)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (February 5, 2025)
K-0371Have properly sized and located compartments to protect residents from smoke.Deficient, Provider has date of correction (February 10, 2025)
K-0911Meet requirements for the installation and maintenance of electrical systems.Deficient, Provider has date of correction (February 6, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (February 5, 2025)
K-0919Meet requirements for the use of electrical equipment.Deficient, Provider has date of correction (February 24, 2025)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (February 26, 2025)

June 15, 2022 — 7 citations

Citations issued on June 15, 2022
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (July 21, 2022)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (July 21, 2022)
K-0331Construct fire resistant interior walls.Deficient, Provider has date of correction (July 25, 2022)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (July 25, 2022)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (July 25, 2022)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (July 21, 2022)
K-0753Have restrictions on the use of highly flammable decorations.Deficient, Provider has date of correction (July 21, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.