Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Maine Veterans Home - So Paris

SOUTH PARIS, ME · 62 certified beds · Last Life Safety survey December 19, 2025

CMS Certification Number 205184 · first certified July 1995

Ownership

Operated by MAINE VETERANS' HOME · Non profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

6
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
2
Inspection & testing records
Of the citations on file

Position within ME

6 citations — more than 9% of the 78 certified nursing homes in ME. Compared within ME rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 1 citation; the earlier surveys in the window averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens January 2027 — about 4 months from now. This facility’s last Life Safety survey was December 2025. Facilities in ME are typically surveyed 13–15 months after the last one (median 14), measured over 115 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Maine Veterans Home - So Paris

One email when it happens. No account; stop it any time with one click.

Which alerts

How that compares

Citations on file over three years

Compared with the median facility in ME, and nationally. Surveyors differ markedly between states, so the ME figure is the meaningful one.

This facility6ME median17National median11
Citations on file over three years, compared
MeasureCitations
This facility6
Median facility in ME17
Median facility nationally11

Survey history

Citations at each Life Safety survey
42023-0712024-1012025-12
Citations at each Life Safety survey
Survey dateCitations
July 21, 20234
October 9, 20241
December 19, 20251

Most-cited tags

Most-cited tags at this facility
K-02112K-09181K-03211K-03631K-01611
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.22025-12-19
K-0918Have generator or other power source capable of supplying service within 10 seconds.12024-10-09
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12023-07-21
K-0363Install corridor and hallway doors that block smoke.12023-07-21
K-0161Use approved construction type or materials.12023-07-21

What the citations cover

Citations by CMS category
  • Egress Deficiencies 2
  • Smoke Deficiencies 2
  • Gas, Vacuum, and Electrical Systems Deficiencies 1
  • Construction Deficiencies 1
Citations by CMS category
CategoryCitations
Egress Deficiencies2
Smoke Deficiencies2
Gas, Vacuum, and Electrical Systems Deficiencies1
Construction Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

December 19, 2025 — 1 citation

Citations issued on December 19, 2025
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (December 23, 2025)

October 9, 2024 — 1 citation

Citations issued on October 9, 2024
TagWhat the surveyor checksStatus
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (October 22, 2024)

July 21, 2023 — 4 citations

Citations issued on July 21, 2023
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (September 1, 2023)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (September 1, 2023)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (September 1, 2023)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (September 1, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.