Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
The Oaks at Belmont
Belmont, MI · 60 certified beds · Last Life Safety survey January 8, 2026
CMS Certification Number 235727 · first certified June 2021
Ownership
Operated by TRILOGY HEALTH SERVICES · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MI
3 citations — more than 5% of the 422 certified nursing homes in MI. Compared within MI rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 0.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens January 2027 — about 3 months from now. This facility’s last Life Safety survey was January 2026. Facilities in MI are typically surveyed 12–14 months after the last one (median 13), measured over 723 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about The Oaks at Belmont
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 3 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in MI, and nationally. Surveyors differ markedly between states, so the MI figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 3 |
| Median facility in MI | 14 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 15, 2023 | 1 |
| October 24, 2024 | 0 |
| January 8, 2026 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2026-01-08 |
| K-0711 | Provide a written emergency evacuation plan. | 1 | 2026-01-08 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2023-11-15 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 1
- Smoke Deficiencies 1
- Miscellaneous Deficiencies 1
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
| Smoke Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 8, 2026 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (January 21, 2026) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (January 21, 2026) |
November 15, 2023 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (November 28, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.