Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Chelsea Retirement Community

Chelsea, MI · 85 certified beds · Last Life Safety survey August 6, 2025

CMS Certification Number 235021 · first certified January 1967

Ownership

Independently operated (no chain recorded by CMS) · Non profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

23
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
6
Tags cited more than once
Across separate surveys
8
Inspection & testing records
Of the citations on file

Position within MI

23 citations — more than 79% of the 422 certified nursing homes in MI. Compared within MI rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 2 citations; the earlier surveys in the window averaged 10.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: July 2026 to September 2026. This facility’s last Life Safety survey was August 2025. Facilities in MI are typically surveyed 12–14 months after the last one (median 13), measured over 723 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Chelsea Retirement Community

One email when it happens. No account; stop it any time with one click.

Which alerts

2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

How that compares

Citations on file over three years

Compared with the median facility in MI, and nationally. Surveyors differ markedly between states, so the MI figure is the meaningful one.

This facility23MI median14National median11
Citations on file over three years, compared
MeasureCitations
This facility23
Median facility in MI14
Median facility nationally11

Survey history

Citations at each Life Safety survey
122023-0592024-0822025-08
Citations at each Life Safety survey
Survey dateCitations
May 25, 202312
August 8, 20249
August 6, 20252

Most-cited tags

Most-cited tags at this facility
K-03212K-03242K-09202K-03412K-02222K-03632K-02931K-09181
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.22024-08-08
K-0324Provide properly protected cooking facilities.22024-08-08
K-0920Ensure proper usage of power strips and extension cords.22025-08-06
K-0341Install a fire alarm system that can be heard throughout the facility.22024-08-08
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.22025-08-06
K-0363Install corridor and hallway doors that block smoke.22024-08-08
K-0293Have properly located and lighted "Exit" signs.12024-08-08
K-0918Have generator or other power source capable of supplying service within 10 seconds.12024-08-08

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 12
  • Gas, Vacuum, and Electrical Systems Deficiencies 5
  • Egress Deficiencies 5
  • Services Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies12
Gas, Vacuum, and Electrical Systems Deficiencies5
Egress Deficiencies5
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

August 6, 2025 — 2 citations

Citations issued on August 6, 2025
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (September 11, 2025)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (September 11, 2025)

August 8, 2024 — 9 citations

Citations issued on August 8, 2024
TagWhat the surveyor checksStatus
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (September 13, 2024)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (September 13, 2024)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (September 13, 2024)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (September 13, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (September 13, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (September 13, 2024)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (September 13, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (September 13, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (September 13, 2024)

May 25, 2023 — 12 citations

Citations issued on May 25, 2023
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (June 30, 2023)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (June 30, 2023)
K-0225Have stairways and smokeproof enclosures used as exits that meet safety requirements.Deficient, Provider has date of correction (June 30, 2023)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (June 30, 2023)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (June 30, 2023)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (June 30, 2023)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (June 30, 2023)
K-0361Ensure that waiting areas, nurse’s stations, gift shops, and cooking facilities, open to the corridor are properly protected.Deficient, Provider has date of correction (June 30, 2023)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (June 30, 2023)
K-0364Install properly constructed windows in hallway walls or doors.Deficient, Provider has date of correction (June 30, 2023)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (June 30, 2023)
K-0925Ensure that sources of ignition are removed from patients receiving respiratory therapy.Deficient, Provider has date of correction (June 30, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.