Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Chelsea Retirement Community
Chelsea, MI · 85 certified beds · Last Life Safety survey August 6, 2025
CMS Certification Number 235021 · first certified January 1967
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MI
23 citations — more than 79% of the 422 certified nursing homes in MI. Compared within MI rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 10.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: July 2026 to September 2026. This facility’s last Life Safety survey was August 2025. Facilities in MI are typically surveyed 12–14 months after the last one (median 13), measured over 723 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Chelsea Retirement Community
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
How that compares
Compared with the median facility in MI, and nationally. Surveyors differ markedly between states, so the MI figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 23 |
| Median facility in MI | 14 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| May 25, 2023 | 12 |
| August 8, 2024 | 9 |
| August 6, 2025 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2024-08-08 |
| K-0324 | Provide properly protected cooking facilities. | 2 | 2024-08-08 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2025-08-06 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 2 | 2024-08-08 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 2 | 2025-08-06 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2024-08-08 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2024-08-08 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2024-08-08 |
What the citations cover
- Smoke Deficiencies 12
- Gas, Vacuum, and Electrical Systems Deficiencies 5
- Egress Deficiencies 5
- Services Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 12 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 5 |
| Egress Deficiencies | 5 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 6, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (September 11, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (September 11, 2025) |
August 8, 2024 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (September 13, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (September 13, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (September 13, 2024) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (September 13, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 13, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (September 13, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (September 13, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 13, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (September 13, 2024) |
May 25, 2023 — 12 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (June 30, 2023) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (June 30, 2023) |
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | Deficient, Provider has date of correction (June 30, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (June 30, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (June 30, 2023) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (June 30, 2023) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (June 30, 2023) |
| K-0361 | Ensure that waiting areas, nurse’s stations, gift shops, and cooking facilities, open to the corridor are properly protected. | Deficient, Provider has date of correction (June 30, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (June 30, 2023) |
| K-0364 | Install properly constructed windows in hallway walls or doors. | Deficient, Provider has date of correction (June 30, 2023) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (June 30, 2023) |
| K-0925 | Ensure that sources of ignition are removed from patients receiving respiratory therapy. | Deficient, Provider has date of correction (June 30, 2023) |