Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Christian Park Village
Escanaba, MI · 59 certified beds · Last Life Safety survey December 4, 2025
CMS Certification Number 235179 · first certified September 1980
Ownership
Operated by CIENA HEALTHCARE/LAUREL HEALTH CARE · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MI
11 citations — more than 37% of the 422 certified nursing homes in MI. Compared within MI rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 0 citations; the earlier surveys in the window averaged 5.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens November 2026 — about 2 months from now. This facility’s last Life Safety survey was December 2025. Facilities in MI are typically surveyed 12–14 months after the last one (median 13), measured over 723 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Christian Park Village
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
How that compares
Compared with the median facility in MI, and nationally. Surveyors differ markedly between states, so the MI figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 11 |
| Median facility in MI | 14 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 16, 2023 | 8 |
| October 2, 2024 | 3 |
| December 4, 2025 | 0 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2024-10-02 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2024-10-02 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2023-11-16 |
| K-0100 | Meet other general requirements. | 1 | 2023-11-16 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2023-11-16 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2023-11-16 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2023-11-16 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2023-11-16 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Services Deficiencies 3
- Smoke Deficiencies 2
- Egress Deficiencies 2
- Other 1
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Services Deficiencies | 3 |
| Smoke Deficiencies | 2 |
| Egress Deficiencies | 2 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
October 2, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0232 | Have corridors or aisles that are unobstructed and are at least 8 feet in width. | Deficient, Provider has date of correction (October 22, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (October 22, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (October 22, 2024) |
November 16, 2023 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0100 | Meet other general requirements. | Deficient, Provider has date of correction (November 29, 2023) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (November 29, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (November 29, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (November 29, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (November 29, 2023) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (November 29, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (November 29, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (November 29, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.