Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
The Laurels of Mt. Pleasant
Mt. Pleasant, MI · 100 certified beds · Last Life Safety survey July 22, 2026
CMS Certification Number 235385 · first certified January 1979
Ownership
Operated by CIENA HEALTHCARE/LAUREL HEALTH CARE · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MI
11 citations — more than 37% of the 422 certified nursing homes in MI. Compared within MI rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys on file averaged 4. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens July 2027 — about 8 months from now. This facility’s last Life Safety survey was July 2026. Facilities in MI are typically surveyed 12–14 months after the last one (median 13), measured over 731 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about The Laurels of Mt. Pleasant
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 11 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in MI, and nationally. Surveyors differ markedly between states, so the MI figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 11 |
| Median facility in MI | 13 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 24, 2024 | 5 |
| June 26, 2025 | 3 |
| July 22, 2026 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 2 | 2026-07-22 |
| K-0232 | Have corridors or aisles that are unobstructed and are at least 8 feet in width. | 1 | 2024-07-24 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2024-07-24 |
| K-0925 | Ensure that sources of ignition are removed from patients receiving respiratory therapy. | 1 | 2026-07-22 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2025-06-26 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2024-07-24 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2024-07-24 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2026-07-22 |
What the citations cover
- Smoke Deficiencies 4
- Egress Deficiencies 4
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Services Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Egress Deficiencies | 4 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
July 22, 2026 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (August 12, 2026) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (August 12, 2026) |
| K-0925 | Ensure that sources of ignition are removed from patients receiving respiratory therapy. | Deficient, Provider has date of correction (August 12, 2026) |
June 26, 2025 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (July 23, 2025) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (July 23, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (July 23, 2025) |
July 24, 2024 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0232 | Have corridors or aisles that are unobstructed and are at least 8 feet in width. | Deficient, Provider has date of correction (August 26, 2024) |
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (August 26, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (August 26, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (August 26, 2024) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (August 26, 2024) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.