Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Froh Community Home
Sturgis, MI · 65 certified beds · Last Life Safety survey June 11, 2026
CMS Certification Number 235345 · first certified January 1978
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Church related
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MI
19 citations — more than 71% of the 422 certified nursing homes in MI. Compared within MI rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 5 citations; the earlier surveys on file averaged 4.7. With 4 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens June 2027 — about 7 months from now. This facility’s last Life Safety survey was June 2026. Facilities in MI are typically surveyed 12–14 months after the last one (median 13), measured over 731 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about Froh Community Home
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 19 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in MI, and nationally. Surveyors differ markedly between states, so the MI figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 19 |
| Median facility in MI | 13 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| January 30, 2024 | 4 |
| May 2, 2024 | 6 |
| May 21, 2025 | 4 |
| June 11, 2026 | 5 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2026-06-11 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2025-05-21 |
| K-0324 | Provide properly protected cooking facilities. | 2 | 2026-06-11 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2026-06-11 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2026-06-11 |
| K-0343 | Have a fire alarm with audible and visual signals that transmits the alarm automatically to notify emergency forces in event of fire. | 1 | 2024-01-30 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2026-06-11 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2025-05-21 |
What the citations cover
- Smoke Deficiencies 11
- Miscellaneous Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Egress Deficiencies 2
- Other 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 11 |
| Miscellaneous Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Egress Deficiencies | 2 |
| Services Deficiencies | 1 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 11, 2026 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (July 17, 2026) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (July 17, 2026) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (July 17, 2026) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (July 17, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (July 17, 2026) |
May 21, 2025 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (June 30, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (June 30, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (June 30, 2025) |
| K-0522 | Have an externally vented heating system. | Deficient, Provider has date of correction (June 30, 2025) |
May 2, 2024 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (June 17, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (October 31, 2024) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (June 17, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (June 17, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (June 17, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (June 17, 2024) |
January 30, 2024 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0100 | Meet other general requirements. | Deficient, Provider has date of correction (February 16, 2024) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (February 16, 2024) |
| K-0343 | Have a fire alarm with audible and visual signals that transmits the alarm automatically to notify emergency forces in event of fire. | Deficient, Provider has date of correction (February 16, 2024) |
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | Deficient, Provider has date of correction (February 16, 2024) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.