Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Hickory Ridge of Temperance

Temperance, MI · 88 certified beds · Last Life Safety survey April 21, 2026

CMS Certification Number 235644 · first certified February 2009

Ownership

Operated by CIENA HEALTHCARE/LAUREL HEALTH CARE · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

19
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
3
Tags cited more than once
Across separate surveys
10
Inspection & testing records
Of the citations on file

Position within MI

19 citations — more than 71% of the 422 certified nursing homes in MI. Compared within MI rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 3 citations; the earlier surveys in the window averaged 8. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens April 2027 — about 6 months from now. This facility’s last Life Safety survey was April 2026. Facilities in MI are typically surveyed 12–14 months after the last one (median 13), measured over 723 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Hickory Ridge of Temperance

One email when it happens. No account; stop it any time with one click.

Which alerts

3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

4 of the 19 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 19 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in MI, and nationally. Surveyors differ markedly between states, so the MI figure is the meaningful one.

This facility19MI median14National median11
Citations on file over three years, compared
MeasureCitations
This facility19
Median facility in MI14
Median facility nationally11

Survey history

Citations at each Life Safety survey
142024-0122025-0332026-04
Citations at each Life Safety survey
Survey dateCitations
January 25, 202414
March 5, 20252
April 21, 20263

Most-cited tags

Most-cited tags at this facility
K-03533K-03452K-05112K-09201K-02111E-00151E-00391E-00041
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0353Inspect, test, and maintain automatic sprinkler systems.32026-04-21
K-0345Have approved installation, maintenance and testing program for fire alarm systems.22026-04-21
K-0511Have properly installed electrical wiring and gas equipment.22025-03-05
K-0920Ensure proper usage of power strips and extension cords.12024-01-25
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.12024-01-25
E-0015Address subsistence needs for staff and patients.12024-01-25
E-0039Conduct testing and exercise requirements.12024-01-25
E-0004Develop and maintain an Emergency Preparedness Program (EP).12024-01-25

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 7
  • Emergency Preparedness Deficiencies 4
  • Gas, Vacuum, and Electrical Systems Deficiencies 2
  • Services Deficiencies 2
  • Other 4
Citations by CMS category
CategoryCitations
Smoke Deficiencies7
Emergency Preparedness Deficiencies4
Gas, Vacuum, and Electrical Systems Deficiencies2
Services Deficiencies2
Miscellaneous Deficiencies2
Egress Deficiencies2

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

April 21, 2026 — 3 citations

Citations issued on April 21, 2026
TagWhat the surveyor checksStatus
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (June 1, 2026)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (June 1, 2026)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (June 1, 2026)

March 5, 2025 — 2 citations

Citations issued on March 5, 2025
TagWhat the surveyor checksStatus
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (April 25, 2025)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (April 25, 2025)

January 25, 2024 — 14 citations

Citations issued on January 25, 2024
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (February 20, 2024)
E-0015Address subsistence needs for staff and patients.Deficient, Provider has date of correction (February 20, 2024)
E-0030List the names and contact information of those in the facility.Deficient, Provider has date of correction (February 20, 2024)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (February 20, 2024)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (February 20, 2024)
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.Deficient, Provider has date of correction (February 20, 2024)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (February 20, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (February 20, 2024)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (February 20, 2024)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (February 20, 2024)
K-0711Provide a written emergency evacuation plan.Deficient, Provider has date of correction (February 20, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (February 20, 2024)
K-0912Have power receptacles that are properly grounded.Deficient, Provider has date of correction (February 20, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (February 20, 2024)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.