Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
HAVEN HOMES OF MAPLE PLAIN
MAPLE PLAIN, MN · 64 certified beds · Last Life Safety survey May 6, 2026
CMS Certification Number 245497 · first certified October 1987
Ownership
Operated by CASSIA · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MN
9 citations — more than 31% of the 338 certified nursing homes in MN. Compared within MN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens April 2027 — about 6 months from now. This facility’s last Life Safety survey was May 2026. Facilities in MN are typically surveyed 11–14 months after the last one (median 13), measured over 613 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about HAVEN HOMES OF MAPLE PLAIN
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 9 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in MN, and nationally. Surveyors differ markedly between states, so the MN figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 9 |
| Median facility in MN | 12 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| May 23, 2024 | 1 |
| July 24, 2025 | 4 |
| May 6, 2026 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 1 | 2026-05-06 |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | 1 | 2025-07-24 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2024-05-23 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2026-05-06 |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 1 | 2026-05-06 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2025-07-24 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2026-05-06 |
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | 1 | 2025-07-24 |
What the citations cover
- Smoke Deficiencies 5
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Miscellaneous Deficiencies 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 5 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Miscellaneous Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 6, 2026 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (May 29, 2026) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (May 29, 2026) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (July 2, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (June 30, 2026) |
July 24, 2025 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (September 5, 2025) |
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | Deficient, Provider has date of correction (September 5, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 5, 2025) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (September 5, 2025) |
May 23, 2024 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (May 22, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.