Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

THE BIRCHES AT TRILLIUM WOODS

PLYMOUTH, MN · 44 certified beds · Last Life Safety survey May 27, 2026

CMS Certification Number 245627 · first certified September 2015

Ownership

Operated by LIFE CARE SERVICES · For profit - Limited Liability company

No change of ownership on CMS record since January 1, 2016, when the records begin.

10
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
5
Inspection & testing records
Of the citations on file

Position within MN

10 citations — more than 38% of the 338 certified nursing homes in MN. Compared within MN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 1 citation; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens April 2027 — about 7 months from now. This facility’s last Life Safety survey was May 2026. Facilities in MN are typically surveyed 11–14 months after the last one (median 13), measured over 613 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about THE BIRCHES AT TRILLIUM WOODS

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

1 of the 10 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

How that compares

Citations on file over three years

Compared with the median facility in MN, and nationally. Surveyors differ markedly between states, so the MN figure is the meaningful one.

This facility10MN median12National median11
Citations on file over three years, compared
MeasureCitations
This facility10
Median facility in MN12
Median facility nationally11

Survey history

Citations at each Life Safety survey
52023-0842024-0912026-05
Citations at each Life Safety survey
Survey dateCitations
August 17, 20235
September 12, 20244
May 27, 20261

Most-cited tags

Most-cited tags at this facility
K-03722K-09211K-07611E-00411K-09011K-02251K-02111K-05211
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.22024-09-12
K-0921Ensure that testing and maintenance of electrical equipment is performed.12026-05-27
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.12024-09-12
E-0041Implement emergency and standby power systems.12023-08-17
K-0901Ensure that building systems meet requirements determined by risk assessment procedures performed by qualified personnel.12023-08-17
K-0225Have stairways and smokeproof enclosures used as exits that meet safety requirements.12024-09-12
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.12023-08-17
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.12024-09-12

What the citations cover

Citations by CMS category
  • Egress Deficiencies 2
  • Smoke Deficiencies 2
  • Gas, Vacuum, and Electrical Systems Deficiencies 2
  • Electrical Deficiencies 1
  • Other 3
Citations by CMS category
CategoryCitations
Egress Deficiencies2
Smoke Deficiencies2
Gas, Vacuum, and Electrical Systems Deficiencies2
Electrical Deficiencies1
Services Deficiencies1
Emergency Preparedness Deficiencies1
Miscellaneous Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

May 27, 2026 — 1 citation

Citations issued on May 27, 2026
TagWhat the surveyor checksStatus
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (July 10, 2026)

September 12, 2024 — 4 citations

Citations issued on September 12, 2024
TagWhat the surveyor checksStatus
K-0225Have stairways and smokeproof enclosures used as exits that meet safety requirements.Deficient, Provider has date of correction (September 24, 2024)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (September 24, 2024)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (September 26, 2024)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (September 27, 2024)

August 17, 2023 — 5 citations

Citations issued on August 17, 2023
TagWhat the surveyor checksStatus
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (September 13, 2023)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (August 18, 2023)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (August 21, 2023)
K-0901Ensure that building systems meet requirements determined by risk assessment procedures performed by qualified personnel.Deficient, Provider has date of correction (September 6, 2023)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (September 13, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.