Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

ST ANTHONY HEALTH & REHABILITATION

ST ANTHONY, MN · 110 certified beds · Last Life Safety survey June 18, 2026

CMS Certification Number 245267 · first certified July 1984

Ownership

Independently operated (no chain recorded by CMS) · For profit - Limited Liability company

No change of ownership on CMS record since January 1, 2016, when the records begin.

36
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
11
Tags cited more than once
Across separate surveys
16
Inspection & testing records
Of the citations on file

Position within MN

36 citations — more than 99% of the 338 certified nursing homes in MN. Compared within MN rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 6 citations; the earlier surveys in the window averaged 15. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens May 2027 — about 8 months from now. This facility’s last Life Safety survey was June 2026. Facilities in MN are typically surveyed 11–14 months after the last one (median 13), measured over 613 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about ST ANTHONY HEALTH & REHABILITATION

One email when it happens. No account; stop it any time with one click.

Which alerts

5 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 36 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in MN, and nationally. Surveyors differ markedly between states, so the MN figure is the meaningful one.

This facility36MN median12National median11
Citations on file over three years, compared
MeasureCitations
This facility36
Median facility in MN12
Median facility nationally11

Survey history

Citations at each Life Safety survey
142024-03162025-0462026-06
Citations at each Life Safety survey
Survey dateCitations
March 7, 202414
April 10, 202516
June 18, 20266

Most-cited tags

Most-cited tags at this facility
K-03533K-03633K-02222K-03212K-02112K-07612K-03242K-09012
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0353Inspect, test, and maintain automatic sprinkler systems.32026-06-18
K-0363Install corridor and hallway doors that block smoke.32026-06-18
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.22025-04-10
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.22026-06-18
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.22026-06-18
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.22025-04-10
K-0324Provide properly protected cooking facilities.22025-04-10
K-0901Ensure that building systems meet requirements determined by risk assessment procedures performed by qualified personnel.22025-04-10

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 15
  • Egress Deficiencies 10
  • Gas, Vacuum, and Electrical Systems Deficiencies 6
  • Miscellaneous Deficiencies 2
  • Other 3
Citations by CMS category
CategoryCitations
Smoke Deficiencies15
Egress Deficiencies10
Gas, Vacuum, and Electrical Systems Deficiencies6
Miscellaneous Deficiencies2
Electrical Deficiencies2
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

June 18, 2026 — 6 citations

Citations issued on June 18, 2026
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (July 28, 2026)
K-0311Have an enclosure around a vertical opening shaft.Deficient, Provider has date of correction (July 28, 2026)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (July 28, 2026)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (July 28, 2026)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has plan of correction (July 28, 2026)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (July 28, 2026)

April 10, 2025 — 16 citations

Citations issued on April 10, 2025
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (May 19, 2025)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (May 19, 2025)
K-0225Have stairways and smokeproof enclosures used as exits that meet safety requirements.Deficient, Provider has date of correction (May 19, 2025)
K-0226Have horizontal exits used in accordance with safety requirements.Deficient, Provider has date of correction (May 19, 2025)
K-0281Install proper backup exit lighting.Deficient, Provider has date of correction (April 24, 2025)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (May 19, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (May 19, 2025)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (May 19, 2025)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (May 19, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (May 19, 2025)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (May 19, 2025)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (May 19, 2025)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (May 19, 2025)
K-0901Ensure that building systems meet requirements determined by risk assessment procedures performed by qualified personnel.Deficient, Provider has date of correction (May 19, 2025)
K-0911Meet requirements for the installation and maintenance of electrical systems.Deficient, Provider has date of correction (May 19, 2025)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (May 19, 2025)

March 7, 2024 — 14 citations

Citations issued on March 7, 2024
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (April 4, 2024)
K-0225Have stairways and smokeproof enclosures used as exits that meet safety requirements.Deficient, Provider has date of correction (April 4, 2024)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (April 4, 2024)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (April 4, 2024)
K-0346Follow proper procedures when the fire alarm was out of service for more than 4 hours.Deficient, Provider has date of correction (April 4, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (April 4, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (April 4, 2024)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (April 4, 2024)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (April 4, 2024)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (April 4, 2024)
K-0901Ensure that building systems meet requirements determined by risk assessment procedures performed by qualified personnel.Deficient, Provider has date of correction (April 4, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (April 4, 2024)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (April 4, 2024)
K-0930Ensure proper storage of liquid oxygen.Deficient, Provider has date of correction (April 4, 2024)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.