Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
STONEBRIDGE CHILLICOTHE
CHILLICOTHE, MO · 75 certified beds · Last Life Safety survey April 24, 2026
CMS Certification Number 265785 · first certified April 2004
Ownership
Operated by STONEBRIDGE SENIOR LIVING · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MO
18 citations — more than 48% of the 486 certified nursing homes in MO. Compared within MO rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 5 citations; the earlier surveys on file averaged 6.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens June 2027 — about 8 months from now. This facility’s last Life Safety survey was April 2026. Facilities in MO are typically surveyed 14–21 months after the last one (median 17), measured over 523 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about STONEBRIDGE CHILLICOTHE
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
How that compares
Compared with the median facility in MO, and nationally. Surveyors differ markedly between states, so the MO figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 18 |
| Median facility in MO | 18 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| June 2, 2023 | 10 |
| January 10, 2025 | 3 |
| April 24, 2026 | 5 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2026-04-24 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2025-01-10 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2025-01-10 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2023-06-02 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2026-04-24 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2026-04-24 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2025-01-10 |
| K-0271 | Have exits that are accessible at all times. | 1 | 2023-06-02 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 5
- Smoke Deficiencies 5
- Egress Deficiencies 4
- Miscellaneous Deficiencies 3
- Other 1
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 5 |
| Smoke Deficiencies | 5 |
| Egress Deficiencies | 4 |
| Miscellaneous Deficiencies | 3 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
April 24, 2026 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (May 30, 2026) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (May 30, 2026) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (May 30, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (May 30, 2026) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (May 30, 2026) |
January 10, 2025 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (February 12, 2025) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (February 12, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (February 12, 2025) |
June 2, 2023 — 10 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0226 | Have horizontal exits used in accordance with safety requirements. | Deficient, Provider has date of correction (July 26, 2023) |
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (July 26, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (July 26, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (July 26, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (July 26, 2023) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (July 26, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (July 26, 2023) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (July 26, 2023) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (July 26, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (July 26, 2023) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.