Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
BAISCH NURSING CENTER
DE SOTO, MO · 61 certified beds · Last Life Safety survey June 4, 2026
CMS Certification Number 265714 · first certified March 2001
Ownership
Independently operated (no chain recorded by CMS) · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MO
11 citations — more than 27% of the 486 certified nursing homes in MO. Compared within MO rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys on file averaged 4. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens August 2027 — about 9 months from now. This facility’s last Life Safety survey was June 2026. Facilities in MO are typically surveyed 14–21 months after the last one (median 17), measured over 523 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about BAISCH NURSING CENTER
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
7 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 11 Life Safety citations above. The Physical Environment Index
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0880 Provide and implement an infection prevention and control program.
- F-0909 Regularly inspect all bed frames, mattresses, and bed rails (if any) for safety; and all bed rails and mattresses must attach safely to the bed frame.
How that compares
Compared with the median facility in MO, and nationally. Surveyors differ markedly between states, so the MO figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 11 |
| Median facility in MO | 18 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| January 26, 2024 | 4 |
| February 28, 2025 | 4 |
| June 4, 2026 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2025-02-28 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2024-01-26 |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | 1 | 2025-02-28 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2024-01-26 |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 1 | 2025-02-28 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2026-06-04 |
| K-0271 | Have exits that are accessible at all times. | 1 | 2024-01-26 |
| K-0311 | Have an enclosure around a vertical opening shaft. | 1 | 2026-06-04 |
What the citations cover
- Smoke Deficiencies 6
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Egress Deficiencies 2
- Miscellaneous Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Egress Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 4, 2026 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (July 15, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (July 15, 2026) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (July 15, 2026) |
February 28, 2025 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 10, 2025) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (April 10, 2025) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (April 10, 2025) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (April 10, 2025) |
January 26, 2024 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (March 1, 2024) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (March 1, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (March 1, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (March 1, 2024) |