Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

AEGIS HEALTH AND REHABILITATION

WILDWOOD, MO · 66 certified beds · Last Life Safety survey May 30, 2025

CMS Certification Number 265539 · first certified June 1993

Ownership

Operated by VERTICAL HEALTH SERVICES · For profit - Individual

  • Ownership changed June 1, 2023 (change of ownership)from SRZ OP BALLWIN LLC
11
Citations on file
Rolling three-year window
4
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
8
Inspection & testing records
Of the citations on file

Position within MO

11 citations — more than 28% of the 487 certified nursing homes in MO. Compared within MO rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 2 citations; the earlier surveys in the window averaged 3. With 4 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: August 2026 to February 2027. This facility’s last Life Safety survey was May 2025. Facilities in MO are typically surveyed 14–21 months after the last one (median 17), measured over 567 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about AEGIS HEALTH AND REHABILITATION

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

1 of the 11 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 11 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.
  • F-0925 Make sure there is a pest control program to prevent/deal with mice, insects, or other pests.

How that compares

Citations on file over three years

Compared with the median facility in MO, and nationally. Surveyors differ markedly between states, so the MO figure is the meaningful one.

This facility11MO median18National median11
Citations on file over three years, compared
MeasureCitations
This facility11
Median facility in MO18
Median facility nationally11

Survey history

Citations at each Life Safety survey
62022-0822023-1212024-0422025-05
Citations at each Life Safety survey
Survey dateCitations
August 5, 20226
December 11, 20232
April 9, 20241
May 30, 20252

Most-cited tags

Most-cited tags at this facility
K-09182K-03531K-05111E-00301K-07121K-02111K-03631K-02911
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0918Have generator or other power source capable of supplying service within 10 seconds.22023-12-11
K-0353Inspect, test, and maintain automatic sprinkler systems.12023-12-11
K-0511Have properly installed electrical wiring and gas equipment.12022-08-05
E-0030List the names and contact information of those in the facility.12022-08-05
K-0712Have simulated fire drills held at unexpected times.12022-08-05
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.12022-08-05
K-0363Install corridor and hallway doors that block smoke.12025-05-30
K-0291Install emergency lighting that can last at least 1 1/2 hours.12025-05-30

What the citations cover

Citations by CMS category
  • Egress Deficiencies 3
  • Gas, Vacuum, and Electrical Systems Deficiencies 3
  • Smoke Deficiencies 2
  • Miscellaneous Deficiencies 1
  • Other 2
Citations by CMS category
CategoryCitations
Egress Deficiencies3
Gas, Vacuum, and Electrical Systems Deficiencies3
Smoke Deficiencies2
Miscellaneous Deficiencies1
Emergency Preparedness Deficiencies1
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

May 30, 2025 — 2 citations

Citations issued on May 30, 2025
TagWhat the surveyor checksStatus
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (June 25, 2025)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (June 25, 2025)

April 9, 2024 — 1 citation

Citations issued on April 9, 2024
TagWhat the surveyor checksStatus
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (May 9, 2024)

December 11, 2023 — 2 citations

Citations issued on December 11, 2023
TagWhat the surveyor checksStatus
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (January 12, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Waiver has been granted (February 29, 2024)

August 5, 2022 — 6 citations

Citations issued on August 5, 2022
TagWhat the surveyor checksStatus
E-0030List the names and contact information of those in the facility.Deficient, Provider has date of correction (September 12, 2022)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (September 12, 2022)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (September 12, 2022)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (September 12, 2022)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (September 12, 2022)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Waiver has been granted (March 5, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.