Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
CHOCTAW RESIDENTIAL CENTER
CHOCTAW, MS · 120 certified beds · Last Life Safety survey March 6, 2025
CMS Certification Number 255339 · first certified August 2013
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Other
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MS
3 citations — more than 85% of the 202 certified nursing homes in MS. Compared within MS rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 1. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Past the typical window (June 2026 to September 2026). Most MS facilities have been surveyed by November 2026. This facility’s last Life Safety survey was March 2025. Facilities in MS are typically surveyed 15–19 months after the last one (median 17), measured over 258 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about CHOCTAW RESIDENTIAL CENTER
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 3 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in MS, and nationally. Surveyors differ markedly between states, so the MS figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 3 |
| Median facility in MS | 1 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| April 14, 2021 | 0 |
| August 24, 2023 | 2 |
| March 6, 2025 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2023-08-24 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2023-08-24 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2025-03-06 |
What the citations cover
- Smoke Deficiencies 3
| Category | Citations |
|---|---|
| Smoke Deficiencies | 3 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 6, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (March 26, 2025) |
August 24, 2023 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (October 5, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (October 5, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.