Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
RIVERSIDE HEALTH & REHABILITATION
MISSOULA, MT · 72 certified beds · Last Life Safety survey January 15, 2026
CMS Certification Number 275126 · first certified December 1988
Ownership
Operated by THE GOODMAN GROUP · For profit - Partnership
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within MT
22 citations — more than 73% of the 61 certified nursing homes in MT. Compared within MT rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 9 citations; the earlier surveys in the window averaged 6.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens January 2027 — about 4 months from now. This facility’s last Life Safety survey was January 2026. Facilities in MT are typically surveyed 12–13 months after the last one (median 12), measured over 104 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about RIVERSIDE HEALTH & REHABILITATION
One email when it happens. No account; stop it any time with one click.
5 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 22 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 22 Life Safety citations above. The Physical Environment Index
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in MT, and nationally. Surveyors differ markedly between states, so the MT figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 22 |
| Median facility in MT | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 20, 2023 | 8 |
| November 7, 2024 | 5 |
| January 15, 2026 | 9 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 2 | 2026-01-15 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2026-01-15 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2026-01-15 |
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2026-01-15 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2026-01-15 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2024-11-07 |
| K-0364 | Install properly constructed windows in hallway walls or doors. | 1 | 2026-01-15 |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 1 | 2024-11-07 |
What the citations cover
- Smoke Deficiencies 11
- Gas, Vacuum, and Electrical Systems Deficiencies 6
- Egress Deficiencies 2
- Miscellaneous Deficiencies 2
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 11 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 6 |
| Egress Deficiencies | 2 |
| Miscellaneous Deficiencies | 2 |
| Emergency Preparedness Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 15, 2026 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (March 4, 2026) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (March 4, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (March 4, 2026) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (March 4, 2026) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (March 4, 2026) |
| K-0364 | Install properly constructed windows in hallway walls or doors. | Deficient, Provider has date of correction (March 4, 2026) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (March 4, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (March 4, 2026) |
| K-0930 | Ensure proper storage of liquid oxygen. | Deficient, Provider has date of correction (March 4, 2026) |
November 7, 2024 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (December 31, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 31, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (December 31, 2024) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (December 31, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (December 31, 2024) |
November 20, 2023 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (January 5, 2024) |
| K-0225 | Have stairways and smokeproof enclosures used as exits that meet safety requirements. | Deficient, Provider has date of correction (December 11, 2023) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (December 11, 2023) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (December 11, 2023) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (December 11, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (December 11, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (December 11, 2023) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (January 11, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.