Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Bermuda Village Retirement Center

Bermuda Run, NC · 36 certified beds · Last Life Safety survey June 11, 2026

CMS Certification Number 345416 · first certified March 1992

Ownership

Independently operated (no chain recorded by CMS) · For profit - Limited Liability company

  • Ownership changed July 1, 2019 (change of ownership)to BERMMUDA VILLAGE RETIREMENT CENTER from BATANGAS CONSULTING LLC
11
Citations on file
CMS's current file
3
Life Safety surveys
CMS's current file
1
Tags cited more than once
Across separate surveys
7
Inspection & testing records
Of the citations on file

Position within NC

11 citations — more than 53% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in CMS's current file.

The latest survey found 6 citations; the earlier surveys on file averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens August 2027 — about 9 months from now. This facility’s last Life Safety survey was June 2026. Facilities in NC are typically surveyed 14–15 months after the last one (median 14), measured over 458 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured

Get an email about Bermuda Village Retirement Center

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 11 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations in CMS's current file

Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.

This facility11NC median10National median11
Citations in CMS's current file, compared
MeasureCitations
This facility11
Median facility in NC10
Median facility nationally11

Survey history

Citations at each Life Safety survey
32023-1222025-0362026-06
Citations at each Life Safety survey
Survey dateCitations
December 15, 20233
March 20, 20252
June 11, 20266

Most-cited tags

Most-cited tags at this facility
K-09183K-09111K-01611K-07121K-03631K-02111K-02001K-03721
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0918Have generator or other power source capable of supplying service within 10 seconds.32026-06-11
K-0911Meet requirements for the installation and maintenance of electrical systems.12023-12-15
K-0161Use approved construction type or materials.12026-06-11
K-0712Have simulated fire drills held at unexpected times.12026-06-11
K-0363Install corridor and hallway doors that block smoke.12026-06-11
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.12023-12-15
K-0200Meet other general requirements.12026-06-11
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12026-06-11

What the citations cover

Citations by CMS category
  • Gas, Vacuum, and Electrical Systems Deficiencies 4
  • Smoke Deficiencies 3
  • Egress Deficiencies 2
  • Miscellaneous Deficiencies 1
  • Other 1
Citations by CMS category
CategoryCitations
Gas, Vacuum, and Electrical Systems Deficiencies4
Smoke Deficiencies3
Egress Deficiencies2
Miscellaneous Deficiencies1
Construction Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

June 11, 2026 — 6 citations

Citations issued on June 11, 2026
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (September 11, 2026)
K-0200Meet other general requirements.Deficient, Provider has date of correction (September 11, 2026)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (September 11, 2026)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (September 11, 2026)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (September 11, 2026)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (September 11, 2026)

March 20, 2025 — 2 citations

Citations issued on March 20, 2025
TagWhat the surveyor checksStatus
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (April 25, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (April 25, 2025)

December 15, 2023 — 3 citations

Citations issued on December 15, 2023
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (February 1, 2024)
K-0911Meet requirements for the installation and maintenance of electrical systems.Deficient, Provider has date of correction (February 1, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (February 1, 2024)

Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.