Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Brunswick Rehabilitation and Healthcare Center
Bolivia, NC · 90 certified beds · Last Life Safety survey March 5, 2025
CMS Certification Number 345549 · first certified January 2010
Ownership
Operated by YAD HEALTHCARE · For profit - Limited Liability company
- Ownership changed June 1, 2024 (change of ownership)to BOLIVIA REHABILITATION AND HEALTHCARE CENTER from UNIVERSAL HEALTH CARE BRUNSWICK INC.
Position within NC
8 citations — more than 34% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 2.3. With 4 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (April 2026 to June 2026), and past the point by which nine in ten NC facilities have been surveyed. This facility’s last Life Safety survey was March 2025. Facilities in NC are typically surveyed 14–16 months after the last one (median 15), measured over 412 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Brunswick Rehabilitation and Healthcare Center
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 8 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 8 |
| Median facility in NC | 9 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| December 16, 2022 | 2 |
| March 27, 2024 | 2 |
| September 5, 2024 | 3 |
| March 5, 2025 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 2 | 2024-03-27 |
| K-0161 | Use approved construction type or materials. | 1 | 2024-09-05 |
| K-0912 | Have power receptacles that are properly grounded. | 1 | 2022-12-16 |
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | 1 | 2024-09-05 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2024-03-27 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2024-09-05 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2025-03-05 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 5
- Smoke Deficiencies 1
- Construction Deficiencies 1
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 5 |
| Smoke Deficiencies | 1 |
| Construction Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 5, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 18, 2025) |
September 5, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (September 12, 2024) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (September 12, 2024) |
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | Deficient, Provider has date of correction (September 12, 2024) |
March 27, 2024 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (May 23, 2024) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (May 23, 2024) |
December 16, 2022 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (March 1, 2023) |
| K-0912 | Have power receptacles that are properly grounded. | Deficient, Provider has date of correction (March 1, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.