12
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
5
Inspection & testing records
Of the citations on file

Position within NC

12 citations — more than 60% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 3 citations; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens March 2027 — about 6 months from now. This facility’s last Life Safety survey was January 2026. Facilities in NC are typically surveyed 14–16 months after the last one (median 15), measured over 412 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Parkview Health and Rehabilitation Center

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

How that compares

Citations on file over three years

Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.

This facility12NC median9National median11
Citations on file over three years, compared
MeasureCitations
This facility12
Median facility in NC9
Median facility nationally11

Survey history

Citations at each Life Safety survey
52023-0442024-1032026-01
Citations at each Life Safety survey
Survey dateCitations
April 28, 20235
October 3, 20244
January 23, 20263

Most-cited tags

Most-cited tags at this facility
K-03632K-05211K-09161K-02111K-03211K-09141K-03511K-02221
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0363Install corridor and hallway doors that block smoke.22024-10-03
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.12023-04-28
K-0916Have a battery powered remote alarm panel in a location accessible by operating personnel.12026-01-23
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.12024-10-03
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12023-04-28
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.12026-01-23
K-0351Install an approved automatic sprinkler system.12024-10-03
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.12023-04-28

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 5
  • Egress Deficiencies 2
  • Gas, Vacuum, and Electrical Systems Deficiencies 2
  • Services Deficiencies 2
  • Other 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies5
Egress Deficiencies2
Gas, Vacuum, and Electrical Systems Deficiencies2
Services Deficiencies2
Miscellaneous Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

January 23, 2026 — 3 citations

Citations issued on January 23, 2026
TagWhat the surveyor checksStatus
K-0781Have restrictions on the use of portable space heaters.Deficient, Provider has date of correction (April 30, 2026)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (April 30, 2026)
K-0916Have a battery powered remote alarm panel in a location accessible by operating personnel.Deficient, Provider has date of correction (April 30, 2026)

October 3, 2024 — 4 citations

Citations issued on October 3, 2024
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (December 31, 2024)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (December 31, 2024)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (December 31, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (December 31, 2024)

April 28, 2023 — 5 citations

Citations issued on April 28, 2023
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (July 15, 2023)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (July 15, 2023)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (July 15, 2023)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (July 15, 2023)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (July 15, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.