Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
UNC Rockingham Rehab & Nursing Care Center
Eden, NC · 121 certified beds · Last Life Safety survey June 19, 2025
CMS Certification Number 345249 · first certified April 1986
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
- Ownership changed January 1, 2018 (change of ownership)to UNC ROCKINGHAM REHABILITATION & NURSING CARE CENTER from MOREHEAD MEMORIAL HOSPITAL
Position within NC
11 citations — more than 56% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: August 2026 to October 2026. This facility’s last Life Safety survey was June 2025. Facilities in NC are typically surveyed 14–16 months after the last one (median 15), measured over 412 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about UNC Rockingham Rehab & Nursing Care Center
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
How that compares
Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 11 |
| Median facility in NC | 9 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 23, 2023 | 3 |
| May 22, 2024 | 6 |
| June 19, 2025 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0923 | Have proper medical gas storage and administration areas. | 2 | 2025-06-19 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2024-05-22 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2024-05-22 |
| K-0371 | Have properly sized and located compartments to protect residents from smoke. | 1 | 2025-06-19 |
| K-0281 | Install proper backup exit lighting. | 1 | 2024-05-22 |
| K-0161 | Use approved construction type or materials. | 1 | 2024-05-22 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 1 | 2024-05-22 |
| K-0352 | Properly install and monitor supervisory attachments on automatic sprinkler systems. | 1 | 2023-03-23 |
What the citations cover
- Smoke Deficiencies 5
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Egress Deficiencies 2
- Construction Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 5 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Egress Deficiencies | 2 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 19, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0371 | Have properly sized and located compartments to protect residents from smoke. | Deficient, Provider has date of correction (September 8, 2025) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (September 8, 2025) |
May 22, 2024 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (August 25, 2024) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (August 25, 2024) |
| K-0281 | Install proper backup exit lighting. | Deficient, Provider has date of correction (August 25, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (August 25, 2024) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (August 25, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (August 25, 2024) |
March 23, 2023 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0352 | Properly install and monitor supervisory attachments on automatic sprinkler systems. | Deficient, Provider has date of correction (May 9, 2023) |
| K-0917 | Ensure electrical receptacles or cover plates have distinctive color or marking. | Deficient, Provider has date of correction (May 9, 2023) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (May 9, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.