Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Chowan River Nursing and Rehabilitation Center
Edenton, NC · 130 certified beds · Last Life Safety survey April 2, 2025
CMS Certification Number 345164 · first certified May 1977
Ownership
Operated by PRINCIPLE LONG TERM CARE · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NC
8 citations — more than 34% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 0 citations; the earlier surveys in the window averaged 4. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (May 2026 to July 2026), and past the point by which nine in ten NC facilities have been surveyed. This facility’s last Life Safety survey was April 2025. Facilities in NC are typically surveyed 14–16 months after the last one (median 15), measured over 412 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Chowan River Nursing and Rehabilitation Center
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 8 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 8 |
| Median facility in NC | 9 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| December 2, 2022 | 5 |
| February 22, 2024 | 3 |
| April 2, 2025 | 0 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2022-12-02 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2022-12-02 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2024-02-22 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2022-12-02 |
| K-0161 | Use approved construction type or materials. | 1 | 2022-12-02 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2024-02-22 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2022-12-02 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2024-02-22 |
What the citations cover
- Smoke Deficiencies 4
- Services Deficiencies 2
- Construction Deficiencies 1
- Gas, Vacuum, and Electrical Systems Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Services Deficiencies | 2 |
| Construction Deficiencies | 1 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
February 22, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 12, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (April 12, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (April 12, 2024) |
December 2, 2022 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (February 18, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (February 18, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (February 18, 2023) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (February 18, 2023) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (February 18, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.