Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Laurel Park Rehabilitation and Healthcare Center
Elizabeth City, NC · 108 certified beds · Last Life Safety survey May 21, 2025
CMS Certification Number 345184 · first certified August 1978
Ownership
Operated by YAD HEALTHCARE · For profit - Corporation
- Ownership changed March 20, 2023 (change of ownership)from CITADEL ELIZABETH CITY LLC
Position within NC
9 citations — more than 45% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 0 citations; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Past the typical window (July 2026 to September 2026). Most NC facilities have been surveyed by October 2026. This facility’s last Life Safety survey was May 2025. Facilities in NC are typically surveyed 14–16 months after the last one (median 15), measured over 412 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Laurel Park Rehabilitation and Healthcare Center
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 9 Life Safety citations above. The Physical Environment Index
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
How that compares
Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 9 |
| Median facility in NC | 9 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 2, 2023 | 5 |
| May 22, 2024 | 4 |
| May 21, 2025 | 0 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2024-05-22 |
| K-0271 | Have exits that are accessible at all times. | 1 | 2023-03-02 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2023-03-02 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2024-05-22 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2024-05-22 |
| K-0161 | Use approved construction type or materials. | 1 | 2023-03-02 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2024-05-22 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2023-03-02 |
What the citations cover
- Smoke Deficiencies 3
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Services Deficiencies 2
- Construction Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 3 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Services Deficiencies | 2 |
| Construction Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 22, 2024 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (July 19, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (July 19, 2024) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (July 19, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (July 19, 2024) |
March 2, 2023 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (May 8, 2023) |
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (May 8, 2023) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (May 8, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (May 8, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (May 8, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.