Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Ignite Medical Resort Huntersville
Huntersville, NC · 168 certified beds · Last Life Safety survey May 29, 2026
CMS Certification Number 345096 · first certified October 1973
Ownership
Operated by ATRIUM HEALTH · Non profit - Corporation
- Ownership changed February 1, 2020 (change of ownership)to HUNTERSVILLE OAKS from HUNTERSVILLE OAKS
Position within NC
6 citations — more than 21% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys on file averaged 1. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens July 2027 — about 8 months from now. This facility’s last Life Safety survey was May 2026. Facilities in NC are typically surveyed 14–15 months after the last one (median 14), measured over 458 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about Ignite Medical Resort Huntersville
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 6 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 6 |
| Median facility in NC | 10 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 16, 2023 | 1 |
| March 14, 2025 | 1 |
| May 29, 2026 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2026-05-29 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2026-05-29 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2026-05-29 |
| K-0271 | Have exits that are accessible at all times. | 1 | 2025-03-14 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 1 | 2026-05-29 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2023-11-16 |
What the citations cover
- Smoke Deficiencies 3
- Egress Deficiencies 2
- Services Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 3 |
| Egress Deficiencies | 2 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 29, 2026 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has no plan of correction |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has no plan of correction |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has no plan of correction |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has no plan of correction |
March 14, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (May 5, 2025) |
November 16, 2023 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 20, 2023) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.