Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Shaire Nursing Center
Lenoir, NC · 60 certified beds · Last Life Safety survey July 3, 2024
CMS Certification Number 345483 · first certified June 1997
Ownership
Independently operated (no chain recorded by CMS) · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NC
9 citations — more than 45% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 4. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (August 2025 to October 2025), and past the point by which nine in ten NC facilities have been surveyed. This facility’s last Life Safety survey was July 2024. Facilities in NC are typically surveyed 14–16 months after the last one (median 15), measured over 412 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Shaire Nursing Center
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 9 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 9 |
| Median facility in NC | 9 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| September 3, 2021 | 2 |
| March 3, 2023 | 6 |
| July 3, 2024 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | 1 | 2023-03-03 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2023-03-03 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 1 | 2023-03-03 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2023-03-03 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 1 | 2021-09-03 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2023-03-03 |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 1 | 2023-03-03 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2021-09-03 |
What the citations cover
- Smoke Deficiencies 4
- Services Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Services Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
July 3, 2024 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (October 15, 2024) |
March 3, 2023 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (April 25, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (April 25, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (April 25, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (April 25, 2023) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (April 25, 2023) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (April 25, 2023) |
September 3, 2021 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (September 23, 2021) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 23, 2021) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.