Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Jacob's Creek Nursing and Rehabilitation Center
Madison, NC · 170 certified beds · Last Life Safety survey December 18, 2025
CMS Certification Number 345050 · first certified May 1968
Ownership
Operated by PRINCIPLE LONG TERM CARE · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NC
10 citations — more than 51% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 4. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens February 2027 — about 4 months from now. This facility’s last Life Safety survey was December 2025. Facilities in NC are typically surveyed 14–16 months after the last one (median 15), measured over 412 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Jacob's Creek Nursing and Rehabilitation Center
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
How that compares
Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 10 |
| Median facility in NC | 9 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| April 27, 2023 | 4 |
| September 18, 2024 | 4 |
| December 18, 2025 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2025-12-18 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 2 | 2025-12-18 |
| K-0324 | Provide properly protected cooking facilities. | 2 | 2024-09-18 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 1 | 2023-04-27 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2024-09-18 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2024-09-18 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2024-09-18 |
What the citations cover
- Smoke Deficiencies 6
- Egress Deficiencies 2
- Services Deficiencies 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Egress Deficiencies | 2 |
| Services Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
December 18, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (February 27, 2026) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (February 27, 2026) |
September 18, 2024 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (January 20, 2025) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (January 20, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (January 20, 2025) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (January 20, 2025) |
April 27, 2023 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (July 5, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (July 5, 2023) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (July 5, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (July 5, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.