Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Grace Heights Health & Rehabilitation
Morganton, NC · 120 certified beds · Last Life Safety survey January 23, 2026
CMS Certification Number 345187 · first certified June 1980
Ownership
Operated by SANSTONE HEALTH & REHABILITATION · For profit - Limited Liability company
- Ownership changed July 1, 2019 (change of ownership)to GRACE HEIGHTS HEALTH AND REHAVILITATION from GRACE NURSING CENTER, INC.
Position within NC
9 citations — more than 45% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens March 2027 — about 6 months from now. This facility’s last Life Safety survey was January 2026. Facilities in NC are typically surveyed 14–16 months after the last one (median 15), measured over 412 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Grace Heights Health & Rehabilitation
One email when it happens. No account; stop it any time with one click.
How that compares
Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 9 |
| Median facility in NC | 9 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| August 31, 2023 | 5 |
| September 11, 2024 | 2 |
| January 23, 2026 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0351 | Install an approved automatic sprinkler system. | 2 | 2026-01-23 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2023-08-31 |
| K-0161 | Use approved construction type or materials. | 1 | 2023-08-31 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2023-08-31 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2026-01-23 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2024-09-11 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2023-08-31 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2023-08-31 |
What the citations cover
- Smoke Deficiencies 6
- Services Deficiencies 2
- Construction Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Services Deficiencies | 2 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 23, 2026 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (May 20, 2026) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (May 5, 2026) |
September 11, 2024 — 2 citations
August 31, 2023 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (November 10, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (November 10, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (November 10, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (November 10, 2023) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (November 10, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.