Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Anson Health and Rehabilitation
Wadesboro, NC · 95 certified beds · Last Life Safety survey October 31, 2024
CMS Certification Number 345051 · first certified October 1968
Ownership
Operated by SANSTONE HEALTH & REHABILITATION · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NC
16 citations — more than 78% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 6.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (December 2025 to February 2026), and past the point by which nine in ten NC facilities have been surveyed. This facility’s last Life Safety survey was October 2024. Facilities in NC are typically surveyed 14–16 months after the last one (median 15), measured over 412 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Anson Health and Rehabilitation
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
How that compares
Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 16 |
| Median facility in NC | 9 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 3, 2022 | 0 |
| August 2, 2023 | 13 |
| October 31, 2024 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2024-10-31 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 2 | 2024-10-31 |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | 1 | 2024-10-31 |
| K-0161 | Use approved construction type or materials. | 1 | 2023-08-02 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2023-08-02 |
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | 1 | 2023-08-02 |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | 1 | 2023-08-02 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2023-08-02 |
What the citations cover
- Smoke Deficiencies 8
- Services Deficiencies 4
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Construction Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 8 |
| Services Deficiencies | 4 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Construction Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
October 31, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | Deficient, Provider has date of correction (December 24, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (December 24, 2024) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (December 24, 2024) |
August 2, 2023 — 13 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (October 21, 2023) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (October 21, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (October 21, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (October 21, 2023) |
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | Deficient, Provider has date of correction (October 21, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (October 21, 2023) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (October 21, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (October 21, 2023) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (October 21, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (October 21, 2023) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (October 21, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (October 21, 2023) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (October 21, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.