Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Cypress Pointe Rehabilitation Center
Wilmington, NC · 90 certified beds · Last Life Safety survey March 20, 2025
CMS Certification Number 345002 · first certified June 1976
Ownership
Operated by SOVEREIGN HEALTHCARE HOLDINGS · For profit - Individual
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NC
7 citations — more than 29% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (May 2026 to July 2026), and past the point by which nine in ten NC facilities have been surveyed. This facility’s last Life Safety survey was March 2025. Facilities in NC are typically surveyed 14–16 months after the last one (median 15), measured over 412 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Cypress Pointe Rehabilitation Center
One email when it happens. No account; stop it any time with one click.
How that compares
Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 7 |
| Median facility in NC | 9 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| September 15, 2022 | 4 |
| February 22, 2024 | 2 |
| March 20, 2025 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2024-02-22 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 1 | 2024-02-22 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2022-09-15 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2022-09-15 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 1 | 2022-09-15 |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 1 | 2025-03-20 |
What the citations cover
- Smoke Deficiencies 4
- Services Deficiencies 1
- Gas, Vacuum, and Electrical Systems Deficiencies 1
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Services Deficiencies | 1 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 20, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (May 14, 2025) |
February 22, 2024 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 16, 2024) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (April 16, 2024) |
September 15, 2022 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (December 18, 2022) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (December 18, 2022) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (December 18, 2022) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (December 18, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.