Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Cypress Pointe Rehabilitation Center

Wilmington, NC · 90 certified beds · Last Life Safety survey May 7, 2026

CMS Certification Number 345002 · first certified June 1976

Ownership

Operated by SOVEREIGN HEALTHCARE HOLDINGS · For profit - Individual

No change of ownership on CMS record since January 1, 2016, when the records begin.

7
Citations on file
CMS's current file
3
Life Safety surveys
CMS's current file
1
Tags cited more than once
Across separate surveys
1
Inspection & testing records
Of the citations on file

Position within NC

7 citations — more than 27% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in CMS's current file.

The latest survey found 4 citations; the earlier surveys on file averaged 1.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens June 2027 — about 8 months from now. This facility’s last Life Safety survey was May 2026. Facilities in NC are typically surveyed 14–15 months after the last one (median 14), measured over 458 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured

Get an email about Cypress Pointe Rehabilitation Center

One email when it happens. No account; stop it any time with one click.

Which alerts

How that compares

Citations in CMS's current file

Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.

This facility7NC median10National median11
Citations in CMS's current file, compared
MeasureCitations
This facility7
Median facility in NC10
Median facility nationally11

Survey history

Citations at each Life Safety survey
22024-0212025-0342026-05
Citations at each Life Safety survey
Survey dateCitations
February 22, 20242
March 20, 20251
May 7, 20264

Most-cited tags

Most-cited tags at this facility
K-03212K-03411K-03511K-02931K-09111K-03721
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.22026-05-07
K-0341Install a fire alarm system that can be heard throughout the facility.12024-02-22
K-0351Install an approved automatic sprinkler system.12026-05-07
K-0293Have properly located and lighted "Exit" signs.12026-05-07
K-0911Meet requirements for the installation and maintenance of electrical systems.12025-03-20
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12026-05-07

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 5
  • Gas, Vacuum, and Electrical Systems Deficiencies 1
  • Egress Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies5
Gas, Vacuum, and Electrical Systems Deficiencies1
Egress Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

May 7, 2026 — 4 citations

Citations issued on May 7, 2026
TagWhat the surveyor checksStatus
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has plan of correction (August 25, 2026)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has plan of correction (August 25, 2026)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has plan of correction (August 25, 2026)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has plan of correction (August 25, 2026)

March 20, 2025 — 1 citation

Citations issued on March 20, 2025
TagWhat the surveyor checksStatus
K-0911Meet requirements for the installation and maintenance of electrical systems.Deficient, Provider has date of correction (May 14, 2025)

February 22, 2024 — 2 citations

Citations issued on February 22, 2024
TagWhat the surveyor checksStatus
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (April 16, 2024)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (April 16, 2024)

Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.