Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Wilson Rehabilitation and Nursing Center

Wilson, NC · 90 certified beds · Last Life Safety survey May 20, 2026

CMS Certification Number 345423 · first certified May 1992

Ownership

Operated by LIFEPOINT HEALTH · For profit - Limited Liability company

No change of ownership on CMS record since January 1, 2016, when the records begin.

16
Citations on file
CMS's current file
3
Life Safety surveys
CMS's current file
3
Tags cited more than once
Across separate surveys
10
Inspection & testing records
Of the citations on file

Position within NC

16 citations — more than 79% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in CMS's current file.

The latest survey found 4 citations; the earlier surveys on file averaged 6. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens July 2027 — about 8 months from now. This facility’s last Life Safety survey was May 2026. Facilities in NC are typically surveyed 14–15 months after the last one (median 14), measured over 458 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured

Get an email about Wilson Rehabilitation and Nursing Center

One email when it happens. No account; stop it any time with one click.

Which alerts

2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

How that compares

Citations in CMS's current file

Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.

This facility16NC median10National median11
Citations in CMS's current file, compared
MeasureCitations
This facility16
Median facility in NC10
Median facility nationally11

Survey history

Citations at each Life Safety survey
62024-0262025-0242026-05
Citations at each Life Safety survey
Survey dateCitations
February 22, 20246
February 13, 20256
May 20, 20264

Most-cited tags

Most-cited tags at this facility
K-02222K-09232K-05212K-09161K-03211K-03241K-03631K-03741
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.22026-05-20
K-0923Have proper medical gas storage and administration areas.22026-05-20
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.22025-02-13
K-0916Have a battery powered remote alarm panel in a location accessible by operating personnel.12024-02-22
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12025-02-13
K-0324Provide properly protected cooking facilities.12025-02-13
K-0363Install corridor and hallway doors that block smoke.12026-05-20
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.12024-02-22

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 7
  • Gas, Vacuum, and Electrical Systems Deficiencies 3
  • Services Deficiencies 3
  • Egress Deficiencies 2
  • Other 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies7
Gas, Vacuum, and Electrical Systems Deficiencies3
Services Deficiencies3
Egress Deficiencies2
Construction Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

May 20, 2026 — 4 citations

Citations issued on May 20, 2026
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has plan of correction (September 24, 2026)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has plan of correction (September 24, 2026)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has plan of correction (September 24, 2026)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has plan of correction (September 24, 2026)

February 13, 2025 — 6 citations

Citations issued on February 13, 2025
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (May 30, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (May 30, 2025)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (May 30, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (May 30, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (May 30, 2025)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (May 30, 2025)

February 22, 2024 — 6 citations

Citations issued on February 22, 2024
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (April 19, 2024)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (April 19, 2024)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (April 19, 2024)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (April 19, 2024)
K-0916Have a battery powered remote alarm panel in a location accessible by operating personnel.Deficient, Provider has date of correction (April 19, 2024)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (April 19, 2024)

Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.