Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Brookridge Retirement Community
Winston-Salem, NC · 77 certified beds · Last Life Safety survey May 9, 2024
CMS Certification Number 345209 · first certified June 1981
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NC
8 citations — more than 34% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
When is the next survey likely?
Well past the typical window (July 2025 to September 2025), and past the point by which nine in ten NC facilities have been surveyed. This facility’s last Life Safety survey was May 2024. Facilities in NC are typically surveyed 14–16 months after the last one (median 15), measured over 412 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Brookridge Retirement Community
One email when it happens. No account; stop it any time with one click.
How that compares
Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 8 |
| Median facility in NC | 9 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| August 5, 2021 | 0 |
| January 26, 2023 | 0 |
| May 9, 2024 | 8 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2024-05-09 |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 1 | 2024-05-09 |
| K-0281 | Install proper backup exit lighting. | 1 | 2024-05-09 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2024-05-09 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2024-05-09 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2024-05-09 |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | 1 | 2024-05-09 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2024-05-09 |
What the citations cover
- Smoke Deficiencies 3
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Egress Deficiencies 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 3 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Egress Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 9, 2024 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0281 | Install proper backup exit lighting. | Deficient, Provider has date of correction (September 1, 2024) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (September 1, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (September 1, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 1, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (September 1, 2024) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (September 1, 2024) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (September 1, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 1, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.