Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Zebulon Rehabilitation Center
Zebulon, NC · 60 certified beds · Last Life Safety survey June 27, 2024
CMS Certification Number 345104 · first certified September 1973
Ownership
Operated by SOVEREIGN HEALTHCARE HOLDINGS · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NC
2 citations — more than 4% of the 419 certified nursing homes in NC. Compared within NC rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
When is the next survey likely?
Well past the typical window (August 2025 to October 2025), and past the point by which nine in ten NC facilities have been surveyed. This facility’s last Life Safety survey was June 2024. Facilities in NC are typically surveyed 14–16 months after the last one (median 15), measured over 412 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Zebulon Rehabilitation Center
One email when it happens. No account; stop it any time with one click.
How that compares
Compared with the median facility in NC, and nationally. Surveyors differ markedly between states, so the NC figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 2 |
| Median facility in NC | 9 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| February 11, 2022 | 0 |
| March 31, 2023 | 0 |
| June 27, 2024 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2024-06-27 |
| K-0161 | Use approved construction type or materials. | 1 | 2024-06-27 |
What the citations cover
- Construction Deficiencies 1
- Gas, Vacuum, and Electrical Systems Deficiencies 1
| Category | Citations |
|---|---|
| Construction Deficiencies | 1 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 27, 2024 — 2 citations
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.