Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Gold Crest Retirement Center

Adams, NE · 52 certified beds · Last Life Safety survey March 12, 2025

CMS Certification Number 285065 · first certified June 1984

Ownership

Independently operated (no chain recorded by CMS) · Non profit - Other

No change of ownership on CMS record since January 1, 2016, when the records begin.

19
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
5
Tags cited more than once
Across separate surveys
6
Inspection & testing records
Of the citations on file

Position within NE

19 citations — more than 63% of the 180 certified nursing homes in NE. Compared within NE rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 7 citations; the earlier surveys in the window averaged 6. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Well past the typical window (March 2026 to May 2026), and past the point by which nine in ten NE facilities have been surveyed. This facility’s last Life Safety survey was March 2025. Facilities in NE are typically surveyed 12–14 months after the last one (median 13), measured over 271 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Gold Crest Retirement Center

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

1 of the 19 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 19 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in NE, and nationally. Surveyors differ markedly between states, so the NE figure is the meaningful one.

This facility19NE median15National median11
Citations on file over three years, compared
MeasureCitations
This facility19
Median facility in NE15
Median facility nationally11

Survey history

Citations at each Life Safety survey
62023-0562024-0472025-03
Citations at each Life Safety survey
Survey dateCitations
May 25, 20236
April 2, 20246
March 12, 20257

Most-cited tags

Most-cited tags at this facility
K-05002K-02222K-07122K-03212K-09202K-03551K-09181K-03741
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0500Meet other general requirements that are deficient.22025-03-12
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.22025-03-12
K-0712Have simulated fire drills held at unexpected times.22025-03-12
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.22025-03-12
K-0920Ensure proper usage of power strips and extension cords.22024-04-02
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.12023-05-25
K-0918Have generator or other power source capable of supplying service within 10 seconds.12023-05-25
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.12024-04-02

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 6
  • Gas, Vacuum, and Electrical Systems Deficiencies 4
  • Egress Deficiencies 3
  • Miscellaneous Deficiencies 2
  • Other 4
Citations by CMS category
CategoryCitations
Smoke Deficiencies6
Gas, Vacuum, and Electrical Systems Deficiencies4
Egress Deficiencies3
Miscellaneous Deficiencies2
Services Deficiencies2
Electrical Deficiencies1
Emergency Preparedness Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

March 12, 2025 — 7 citations

Citations issued on March 12, 2025
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (April 22, 2025)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (April 22, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (April 22, 2025)
K-0500Meet other general requirements that are deficient.Deficient, Provider has date of correction (April 22, 2025)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (April 22, 2025)
K-0901Ensure that building systems meet requirements determined by risk assessment procedures performed by qualified personnel.Deficient, Provider has date of correction (April 22, 2025)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (April 22, 2025)

April 2, 2024 — 6 citations

Citations issued on April 2, 2024
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (May 15, 2024)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (May 15, 2024)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (May 15, 2024)
K-0500Meet other general requirements that are deficient.Deficient, Provider has date of correction (May 15, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (May 15, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (May 15, 2024)

May 25, 2023 — 6 citations

Citations issued on May 25, 2023
TagWhat the surveyor checksStatus
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (July 5, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (July 5, 2023)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (July 5, 2023)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (July 5, 2023)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (July 5, 2023)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (July 5, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.