Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Beaver City Manor
Beaver City, NE · 30 certified beds · Last Life Safety survey June 12, 2025
CMS Certification Number 285269 · first certified October 2005
Ownership
Independently operated (no chain recorded by CMS) · Government - City
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NE
9 citations — more than 21% of the 180 certified nursing homes in NE. Compared within NE rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Well past the typical window (June 2026 to August 2026), and past the point by which nine in ten NE facilities have been surveyed. This facility’s last Life Safety survey was June 2025. Facilities in NE are typically surveyed 12–14 months after the last one (median 13), measured over 271 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Beaver City Manor
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 9 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in NE, and nationally. Surveyors differ markedly between states, so the NE figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 9 |
| Median facility in NE | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| June 28, 2023 | 4 |
| July 10, 2024 | 3 |
| June 12, 2025 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 3 | 2025-06-12 |
| K-0925 | Ensure that sources of ignition are removed from patients receiving respiratory therapy. | 1 | 2024-07-10 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2024-07-10 |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | 1 | 2023-06-28 |
| K-0919 | Meet requirements for the use of electrical equipment. | 1 | 2023-06-28 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2023-06-28 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 1 | 2025-06-12 |
What the citations cover
- Smoke Deficiencies 5
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 5 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 12, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (July 27, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (July 27, 2025) |
July 10, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (August 24, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (August 24, 2024) |
| K-0925 | Ensure that sources of ignition are removed from patients receiving respiratory therapy. | Deficient, Provider has date of correction (August 24, 2024) |
June 28, 2023 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (August 11, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (August 11, 2023) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (August 11, 2023) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (August 11, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.