Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Eventide Crete

Crete, NE · 38 certified beds · Last Life Safety survey September 18, 2025

CMS Certification Number 285283 · first certified October 2009

Ownership

Independently operated (no chain recorded by CMS) · Non profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

11
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
7
Inspection & testing records
Of the citations on file

Position within NE

11 citations — more than 33% of the 180 certified nursing homes in NE. Compared within NE rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Holding steadyabout the same at the latest survey as at its earlier surveys in the window.

The latest survey found 4 citations; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: September 2026 to November 2026. This facility’s last Life Safety survey was September 2025. Facilities in NE are typically surveyed 12–14 months after the last one (median 13), measured over 271 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Eventide Crete

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 11 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in NE, and nationally. Surveyors differ markedly between states, so the NE figure is the meaningful one.

This facility11NE median15National median11
Citations on file over three years, compared
MeasureCitations
This facility11
Median facility in NE15
Median facility nationally11

Survey history

Citations at each Life Safety survey
42023-1032024-0842025-09
Citations at each Life Safety survey
Survey dateCitations
October 5, 20234
August 13, 20243
September 18, 20254

Most-cited tags

Most-cited tags at this facility
K-05112K-07121K-03631K-03451K-02221K-09201K-09181K-03211
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0511Have properly installed electrical wiring and gas equipment.22025-09-18
K-0712Have simulated fire drills held at unexpected times.12023-10-05
K-0363Install corridor and hallway doors that block smoke.12024-08-13
K-0345Have approved installation, maintenance and testing program for fire alarm systems.12025-09-18
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.12025-09-18
K-0920Ensure proper usage of power strips and extension cords.12023-10-05
K-0918Have generator or other power source capable of supplying service within 10 seconds.12025-09-18
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12024-08-13

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 3
  • Services Deficiencies 3
  • Gas, Vacuum, and Electrical Systems Deficiencies 3
  • Miscellaneous Deficiencies 1
  • Other 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies3
Services Deficiencies3
Gas, Vacuum, and Electrical Systems Deficiencies3
Miscellaneous Deficiencies1
Egress Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

September 18, 2025 — 4 citations

Citations issued on September 18, 2025
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (October 31, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (October 31, 2025)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (October 31, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (October 31, 2025)

August 13, 2024 — 3 citations

Citations issued on August 13, 2024
TagWhat the surveyor checksStatus
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (September 27, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (September 27, 2024)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (September 27, 2024)

October 5, 2023 — 4 citations

Citations issued on October 5, 2023
TagWhat the surveyor checksStatus
K-0500Meet other general requirements that are deficient.Deficient, Provider has date of correction (October 17, 2023)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (October 17, 2023)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (October 17, 2023)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (October 17, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.