Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Eventide Williamsburg
Lincoln, NE · 50 certified beds · Last Life Safety survey December 4, 2025
CMS Certification Number 285288 · first certified May 2014
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NE
16 citations — more than 53% of the 180 certified nursing homes in NE. Compared within NE rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 8 citations; the earlier surveys in the window averaged 4. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens December 2026 — about 2 months from now. This facility’s last Life Safety survey was December 2025. Facilities in NE are typically surveyed 12–14 months after the last one (median 13), measured over 271 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Eventide Williamsburg
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 16 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in NE, and nationally. Surveyors differ markedly between states, so the NE figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 16 |
| Median facility in NE | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| December 12, 2023 | 1 |
| November 21, 2024 | 7 |
| December 4, 2025 | 8 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2025-12-04 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2025-12-04 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2024-11-21 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2024-11-21 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2025-12-04 |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | 1 | 2025-12-04 |
| K-0500 | Meet other general requirements that are deficient. | 1 | 2025-12-04 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2024-11-21 |
What the citations cover
- Smoke Deficiencies 7
- Gas, Vacuum, and Electrical Systems Deficiencies 6
- Services Deficiencies 1
- Miscellaneous Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 7 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 6 |
| Services Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
December 4, 2025 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (January 18, 2026) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (January 18, 2026) |
| K-0500 | Meet other general requirements that are deficient. | Deficient, Provider has date of correction (January 18, 2026) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (January 18, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (January 18, 2026) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (January 18, 2026) |
| K-0922 | Meet requirements for the use and maintenance of medical gas equipment. | Deficient, Provider has date of correction (January 18, 2026) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (January 18, 2026) |
November 21, 2024 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (January 5, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (January 5, 2025) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (January 5, 2025) |
| K-0361 | Ensure that waiting areas, nurse’s stations, gift shops, and cooking facilities, open to the corridor are properly protected. | Deficient, Provider has date of correction (January 5, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (January 5, 2025) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (January 5, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (January 5, 2025) |
December 12, 2023 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (January 25, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.