Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Bethany Home, Inc
Minden, NE · 64 certified beds · Last Life Safety survey June 26, 2025
CMS Certification Number 285270 · first certified October 2005
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NE
21 citations — more than 70% of the 180 certified nursing homes in NE. Compared within NE rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 7 citations; the earlier surveys in the window averaged 7. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Past the typical window (June 2026 to September 2026). Most NE facilities have been surveyed by October 2026. This facility’s last Life Safety survey was June 2025. Facilities in NE are typically surveyed 12–14 months after the last one (median 13), measured over 271 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Bethany Home, Inc
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
4 of the 21 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 21 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in NE, and nationally. Surveyors differ markedly between states, so the NE figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 21 |
| Median facility in NE | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| June 8, 2023 | 7 |
| May 2, 2024 | 7 |
| June 26, 2025 | 7 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| E-0041 | Implement emergency and standby power systems. | 3 | 2025-06-26 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 3 | 2025-06-26 |
| K-0324 | Provide properly protected cooking facilities. | 2 | 2025-06-26 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2024-05-02 |
| K-0754 | Provide properly sized and located linen or trash receptacles. | 1 | 2024-05-02 |
| E-0035 | Provide family notifications of emergency plan. | 1 | 2025-06-26 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2025-06-26 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2024-05-02 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 8
- Smoke Deficiencies 5
- Emergency Preparedness Deficiencies 4
- Miscellaneous Deficiencies 2
- Other 2
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 8 |
| Smoke Deficiencies | 5 |
| Emergency Preparedness Deficiencies | 4 |
| Miscellaneous Deficiencies | 2 |
| Egress Deficiencies | 1 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 26, 2025 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0035 | Provide family notifications of emergency plan. | Deficient, Provider has date of correction (August 8, 2025) |
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (August 22, 2025) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (August 22, 2025) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (August 22, 2025) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (August 22, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 22, 2025) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (August 22, 2025) |
May 2, 2024 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (June 7, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (June 7, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (June 7, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (June 7, 2024) |
| K-0754 | Provide properly sized and located linen or trash receptacles. | Deficient, Provider has date of correction (June 7, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (June 7, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (June 7, 2024) |
June 8, 2023 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (July 31, 2023) |
| K-0131 | Meet requirements for sections of health care facilities separated by fire resistive construction. | Deficient, Provider has date of correction (July 31, 2023) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (July 31, 2023) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (July 31, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (July 31, 2023) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (July 31, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (July 31, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.