Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Rockingham County Nursing Home

BRENTWOOD, NH · 226 certified beds · Last Life Safety survey August 28, 2025

CMS Certification Number 305046 · first certified November 1995

Ownership

Independently operated (no chain recorded by CMS) · Government - County

No change of ownership on CMS record since January 1, 2016, when the records begin.

4
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
0
Tags cited more than once
Across separate surveys
1
Inspection & testing records
Of the citations on file

Position within NH

4 citations — more than 21% of the 73 certified nursing homes in NH. Compared within NH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 3 citations; the earlier surveys in the window averaged 0.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: August 2026 to October 2026. This facility’s last Life Safety survey was August 2025. Facilities in NH are typically surveyed 12–13 months after the last one (median 13), measured over 131 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Rockingham County Nursing Home

One email when it happens. No account; stop it any time with one click.

Which alerts

Physical environment (health survey)

1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 4 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in NH, and nationally. Surveyors differ markedly between states, so the NH figure is the meaningful one.

This facility4NH median7National median11
Citations on file over three years, compared
MeasureCitations
This facility4
Median facility in NH7
Median facility nationally11

Survey history

Citations at each Life Safety survey
12023-0702024-0832025-08
Citations at each Life Safety survey
Survey dateCitations
July 12, 20231
August 22, 20240
August 28, 20253

Most-cited tags

Most-cited tags at this facility
K-03511K-03531K-02231K-03211
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0351Install an approved automatic sprinkler system.12023-07-12
K-0353Inspect, test, and maintain automatic sprinkler systems.12025-08-28
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.12025-08-28
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12025-08-28

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 3
  • Egress Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies3
Egress Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

August 28, 2025 — 3 citations

Citations issued on August 28, 2025
TagWhat the surveyor checksStatus
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.Deficient, Provider has date of correction (October 20, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (October 20, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (October 20, 2025)

July 12, 2023 — 1 citation

Citations issued on July 12, 2023
TagWhat the surveyor checksStatus
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (July 20, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.