Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
GLENCLIFF HOME FOR THE ELDERLY
GLENCLIFF, NH · 130 certified beds · Last Life Safety survey October 30, 2025
CMS Certification Number 30E059 · first certified June 1979
Ownership
Independently operated (no chain recorded by CMS) · Government - State
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within NH
2 citations — more than 13% of the 73 certified nursing homes in NH. Compared within NH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 0.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens October 2026 — about 1 month from now. This facility’s last Life Safety survey was October 2025. Facilities in NH are typically surveyed 12–13 months after the last one (median 13), measured over 131 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about GLENCLIFF HOME FOR THE ELDERLY
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 2 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in NH, and nationally. Surveyors differ markedly between states, so the NH figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 2 |
| Median facility in NH | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| October 18, 2023 | 1 |
| November 7, 2024 | 0 |
| October 30, 2025 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2025-10-30 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2023-10-18 |
What the citations cover
- Smoke Deficiencies 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
October 30, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (January 23, 2026) |
October 18, 2023 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (November 13, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.