Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
GOFFSTOWN NURSING AND REHAB CENTER
GOFFSTOWN, NH · 41 certified beds · Last Life Safety survey December 3, 2025
CMS Certification Number 305096 · first certified November 2003
Ownership
Independently operated (no chain recorded by CMS) · For profit - Limited Liability company
- Ownership changed July 8, 2022 (change of ownership)to GOFFSTOWN NURSING & REHAB CENTER from BEL-AIR NURSING AND REHAB CENTER INC
Position within NH
20 citations — more than 96% of the 73 certified nursing homes in NH. Compared within NH rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 8 citations; the earlier surveys in the window averaged 6. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens November 2026 — about 2 months from now. This facility’s last Life Safety survey was December 2025. Facilities in NH are typically surveyed 12–13 months after the last one (median 13), measured over 131 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about GOFFSTOWN NURSING AND REHAB CENTER
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
6 of the 20 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 20 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NH, and nationally. Surveyors differ markedly between states, so the NH figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 20 |
| Median facility in NH | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| October 26, 2023 | 8 |
| October 22, 2024 | 4 |
| December 3, 2025 | 8 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0712 | Have simulated fire drills held at unexpected times. | 3 | 2025-12-03 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 3 | 2025-12-03 |
| K-0919 | Meet requirements for the use of electrical equipment. | 1 | 2024-10-22 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2023-10-26 |
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | 1 | 2025-12-03 |
| E-0015 | Address subsistence needs for staff and patients. | 1 | 2023-10-26 |
| E-0039 | Conduct testing and exercise requirements. | 1 | 2023-10-26 |
| E-0006 | Conduct risk assessment and an All-Hazards approach. | 1 | 2025-12-03 |
What the citations cover
- Smoke Deficiencies 7
- Emergency Preparedness Deficiencies 6
- Miscellaneous Deficiencies 4
- Gas, Vacuum, and Electrical Systems Deficiencies 3
| Category | Citations |
|---|---|
| Smoke Deficiencies | 7 |
| Emergency Preparedness Deficiencies | 6 |
| Miscellaneous Deficiencies | 4 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
December 3, 2025 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (January 16, 2026) |
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (January 16, 2026) |
| E-0009 | Include a process for Emergency Preparedness collaboration. | Deficient, Provider has date of correction (January 16, 2026) |
| E-0030 | List the names and contact information of those in the facility. | Deficient, Provider has date of correction (January 16, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (January 16, 2026) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (January 16, 2026) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (January 16, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (January 16, 2026) |
October 22, 2024 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (December 19, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (December 19, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (December 19, 2024) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (December 19, 2024) |
October 26, 2023 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0015 | Address subsistence needs for staff and patients. | Deficient, Provider has date of correction (December 13, 2023) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (December 13, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (December 13, 2023) |
| K-0344 | Have an alternate power supply for its alarm system. | Deficient, Provider has date of correction (December 13, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (December 13, 2023) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (December 13, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (December 13, 2023) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (December 13, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.