Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
ALLENDALE REHABILITATION AND HEALTHCARE CENTER
ALLENDALE, NJ · 120 certified beds · Last Life Safety survey November 25, 2025
CMS Certification Number 315497 · first certified June 2006
Ownership
Operated by MARQUIS HEALTH SERVICES · For profit - Corporation
- Ownership changed August 4, 2021 (change of ownership)from ALLENDALE NURSING HOME INC
Position within NJ
15 citations — more than 50% of the 348 certified nursing homes in NJ. Compared within NJ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 5 citations; the earlier surveys in the window averaged 3.3. With 4 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens March 2027 — about 6 months from now. This facility’s last Life Safety survey was November 2025. Facilities in NJ are typically surveyed 16–20 months after the last one (median 17), measured over 431 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about ALLENDALE REHABILITATION AND HEALTHCARE CENTER
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 15 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in NJ, and nationally. Surveyors differ markedly between states, so the NJ figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 15 |
| Median facility in NJ | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| October 11, 2022 | 7 |
| June 21, 2024 | 2 |
| August 8, 2025 | 1 |
| November 25, 2025 | 5 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0351 | Install an approved automatic sprinkler system. | 2 | 2025-11-25 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2025-11-25 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2025-11-25 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2022-10-11 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2025-11-25 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 1 | 2025-11-25 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 1 | 2022-10-11 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2022-10-11 |
What the citations cover
- Smoke Deficiencies 7
- Egress Deficiencies 3
- Services Deficiencies 3
- Gas, Vacuum, and Electrical Systems Deficiencies 1
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 7 |
| Egress Deficiencies | 3 |
| Services Deficiencies | 3 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
November 25, 2025 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (January 6, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (January 6, 2026) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (January 6, 2026) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (December 22, 2025) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (December 22, 2025) |
August 8, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0281 | Install proper backup exit lighting. | Deficient, Provider has date of correction (August 28, 2025) |
June 21, 2024 — 2 citations
October 11, 2022 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (November 4, 2022) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (November 4, 2022) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (November 4, 2022) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (November 25, 2022) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (November 4, 2022) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (November 4, 2022) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (November 18, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.