Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
FALLSVIEW NURSING AND REHABILITATION CENTER
BOONTON, NJ · 117 certified beds · Last Life Safety survey March 19, 2026
CMS Certification Number 315492 · first certified July 2005
Ownership
Operated by ALLAIRE HEALTH SERVICES · For profit - Limited Liability company
- Ownership changed October 25, 2022 (change of ownership)from BOONTON CARE CENTER LLC
Position within NJ
19 citations — more than 65% of the 348 certified nursing homes in NJ. Compared within NJ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 5 citations; the earlier surveys on file averaged 7. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens July 2027 — about 8 months from now. This facility’s last Life Safety survey was March 2026. Facilities in NJ are typically surveyed 16–19 months after the last one (median 17), measured over 464 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about FALLSVIEW NURSING AND REHABILITATION CENTER
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 19 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in NJ, and nationally. Surveyors differ markedly between states, so the NJ figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 19 |
| Median facility in NJ | 15 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 28, 2023 | 5 |
| October 2, 2024 | 9 |
| March 19, 2026 | 5 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0161 | Use approved construction type or materials. | 3 | 2026-03-19 |
| K-0351 | Install an approved automatic sprinkler system. | 2 | 2024-10-02 |
| K-0531 | Have elevators that firefighters can control in the event of a fire. | 2 | 2026-03-19 |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | 1 | 2026-03-19 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2024-10-02 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2024-10-02 |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 1 | 2023-07-28 |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | 1 | 2024-10-02 |
What the citations cover
- Smoke Deficiencies 8
- Construction Deficiencies 3
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Services Deficiencies 3
- Other 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 8 |
| Construction Deficiencies | 3 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Services Deficiencies | 3 |
| Miscellaneous Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 19, 2026 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has no plan of correction |
| K-0281 | Install proper backup exit lighting. | Deficient, Provider has date of correction (May 13, 2026) |
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (May 13, 2026) |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | Deficient, Provider has date of correction (May 13, 2026) |
| K-0531 | Have elevators that firefighters can control in the event of a fire. | Deficient, Provider has date of correction (June 3, 2026) |
October 2, 2024 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Waiver has been granted (November 8, 2024) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (November 8, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (November 8, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (November 8, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (November 8, 2024) |
| K-0531 | Have elevators that firefighters can control in the event of a fire. | Deficient, Provider has date of correction (November 8, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (November 8, 2024) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (November 8, 2024) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (November 8, 2024) |
July 28, 2023 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Waiver has been granted (November 17, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (October 4, 2023) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (September 28, 2023) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (July 29, 2023) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (September 8, 2023) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.